1 / 6

Workshop on controls renovation

Workshop on controls renovation. Introductory remarks Hermann Schmickler, AB-CO. Outline. From AB risk analysis to the injector controls renovation project Financial boundary conditions Aim of this workshop. History (1/2).

jsamuel
Download Presentation

Workshop on controls renovation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workshop on controls renovation Introductory remarks Hermann Schmickler, AB-CO

  2. Outline • From AB risk analysis to the injector controls renovation project • Financial boundary conditions • Aim of this workshop

  3. History (1/2) • AB risk analysis (2003?, P.Bonal et al) as starting point of AB consolidation project controls proposals ranked very low on risk • CO internal motivation: Standardization of deployed hardware and software to latest standard (=LHC) in order to anticipate the departure of the (on average) older staff familiar with “CPS controls”; overall reduction in staff necessary for controls • 2006 onwards: Exploitation budget defined as 10% of the installed controls infrastructure. AB-CO created CPS controls renovation “to be financed out of AB-CO exploitation budget”

  4. History (2/2) • First inventory of FE hardware and software by F.di Maio in 2007. Estimated replacement cost: 3 Msfr over 3 years, 25 FTEy for the reengineering of 125 GM classes. • 2007 also start of INCA project for applications. • Good progress so far in preparation of the hardware platforms, timing renovation project (white rabbit) and INCA. • End 2008: This workshop

  5. Scope of project • Hardware renovation of:“LHC injector chain”, i.e. Linac2, booster, PS, SPS, + linac3, LEIREstimated hardware cost: 3 MSFR • INCA • Necessary additions: AD (projects for extension of lifetime to 2012/2016) CO: 550 ksfrCTF3 (future as X-ray power source; needs controls consolidation, no estimate today)REX/ISOLDE: to be analysed

  6. Purpose of this workshop • Present the ideas of individual parties on this project • Get commitments of the equipment groups and of AB-OP to contribute to the project and to follow the planning • Synthesize exact project definition and responsibility limits during the renovation phase and for the future exploitation phase (= present AB controls model?) • Verify the original cost estimates • Get input for planning • Discuss structure for project follow-up: (my suggestion: Extend the AB-CO3 to the sector level and have the project coordinated through CO3; Chairman of CO3 = PL of controls renovation?)

More Related