1 / 21

BeoDat: Spatial Data Hub in Bernese Oberland with Data Checker

See how BeoDat, a spatial data hub in Bernese Oberland, utilizes INTERLIS to ensure data integrity and provide data checking services. Explore the system architecture, data flow, check service, and geoshop functionalities in this informative presentation.

jswan
Download Presentation

BeoDat: Spatial Data Hub in Bernese Oberland with Data Checker

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTERLIS in action BeoDat: Spatial Data Hub in Bernese Oberland with data Checker P. Dütschler, Ing.-Geometer, M. Bigler, Geomatiker FH Dütschler & Naegeli, Surveying + Geoinformation, Thun, Switzerland ISO/TC211 Workshop 21.05.03 Thun

  2. Agenda • BeoDat background • System architecture • Data flow • Check service • Demo • Conclusion ISO/TC211 Workshop 21.05.03 Thun

  3. BeoDat background • 7 independent surveying offices • 4 different software systems C-Plan, Adalin, Intergraph, ESRI • ~100 communities • ~180‘000 inhabitants • 1 geo-language INTERLIS • Budget SFR 100‘000.- • Show technical functionality • Take the lead in geo-competence ISO/TC211 Workshop 21.05.03 Thun

  4. System architecture • Concept allows cascading • Switzerland • Canton Berne • Regional BeoDat • Model driven approach • Emanzipation from SW • Data capture at the source • Standard technologies • Automatic transactions • Cascading by increasing load ISO/TC211 Workshop 21.05.03 Thun

  5. ISO/TC211 Workshop 21.05.03 Thun

  6. Data Flow ISO/TC211 Workshop 21.05.03 Thun

  7. Check Service ISO/TC211 Workshop 21.05.03 Thun

  8. Check Service • Online check by operator with FTP ISO/TC211 Workshop 21.05.03 Thun

  9. Check Service • Central Service, run by the canton of Berne (Cantonal Surveying Office) • For free • Checks about 2‘000 different error-types • Checks with different Databases (Tridat) • Takes 5 Minutes from the start to the result • Result by email (Download-link) • Error and Plot included ISO/TC211 Workshop 21.05.03 Thun

  10. Error statistics ISO/TC211 Workshop 21.05.03 Thun

  11. Demo ISO/TC211 Workshop 21.05.03 Thun

  12. Geoshop functionalities • personal Login (if enabled) • user and view management • Data upload (FTP) • INTERLIS, DWG, SHP, etc. • Semantic Transfer • Data test • internal Data Viewer catalog search • Queries, Selections, Plot • Export, Delivery, Shop • automatic batch processes • scalable ISO/TC211 Workshop 21.05.03 Thun

  13. Geoshop ISO/TC211 Workshop 21.05.03 Thun

  14. ISO/TC211 Workshop 21.05.03 Thun

  15. ISO/TC211 Workshop 21.05.03 Thun

  16. ISO/TC211 Workshop 21.05.03 Thun

  17. yesterday Data exchange today between Producers and Consumers of Geodata Floppy/Band Surveyor PLA Dep X Utility Office Y etc. GEO405-DXF, INTERLIS, etc. ISO/TC211 Workshop 21.05.03 Thun

  18. Dataexchange with INTERLIS Producers Consumers Complete View on integrated Data Possible Surveyor PLA Datapool Water/Gas Dep X etc. Office N INTERLIS INTERLIS, DXF, etc. ISO/TC211 Workshop 21.05.03 Thun

  19. BeoDat BeoDat Datendrehscheibe Ortsinformationssystem ISO/TC211 Workshop 21.05.03 Thun FLOTRON AG 2003

  20. Conclusion 1/2 • Why is it intersting for a private office to work with INTERLIS • Developpements overdure SW-Versions • Freedom in choose of SW • Data integrity • Stability for investment/cost effectifness • Higher service level towards customers/better Products ISO/TC211 Workshop 21.05.03 Thun

  21. HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW SW SW SW SW SW SW SW SW SW SW SW SW INTERLIS V1 INTERLIS Vx Data Conclusions 2/2 ISO/TC211 Workshop 21.05.03 Thun

More Related