Benefits Obsolescence Reduction Risk Reduction Safety Improvement Cost Reduction

Area(s) of Significant Benefit Safety Performance Sustainability Operations Infrastructure . Passive Millimeter Wave Imaging. Description

juana
Download Presentation

Benefits Obsolescence Reduction Risk Reduction Safety Improvement Cost Reduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Area(s) of Significant Benefit Safety Performance Sustainability Operations Infrastructure Passive Millimeter Wave Imaging • Description • Millimeter wavelength visual inspection technique for pre-launch inspection of External Tank (ET) through insulating foam, requiring no electromagnetic energy illumination • Also provides clear imaging through the plume exhaust during launch • Non-intrusively improves the safety of the orbiter/SRBs/ET as launched • Operates through detecting natural emissions • Technologies and Capabilities • Detects separation of foam on ET and detects cracks in SRB fuel segments during assembly • Images in real-time (10 images/sec) during launch, even through SRM exhaust, since millimeter wavelengths are not obscured by either SRM exhaust particles or exhaust plasma • Requires no new development of sensor technologies, but re-uses technologies already developed for Homeland Security applications Benefits Obsolescence Reduction Risk Reduction Safety Improvement Cost Reduction Process Improvement Other Operations Improvement Performance Enhancement • Impacts and Maturity • TRL 6 • POC: Dr. Gary Bastin / Temel Erdogan; ASRC Aerospace. (USTDC), (321) 867-9275 • Increases orbiter safety during ascent & reentry • Economical (since it requires no STS mods) • Reduction in Category 1 Failure Rate of 0.2%

  2. Passive Millimeter Wave Imaging • Total Project Costs: $ 4.75 M • Feasibility: $ 0.25 M • Formulation: $ 1.5 M • Implementation: $ 3 M (full scale) • Project Submitted By: Dr. Gary Bastin / Temel Erdogan • ASRC Aerospace. (USTDC)