1 / 2

Benefits and Impacts Obsolescence Reduction Risk Reduction Safety Improvement Cost Reduction

Software Development Tool for Enabling Flawless Shuttle Enhancement Integration. Area(s) of Significant Benefit Safety Performance Sustainability Operations Infrastructure . Description Systems-level framework infused within a software development toolkit

eadoin
Download Presentation

Benefits and Impacts Obsolescence Reduction Risk Reduction Safety Improvement Cost Reduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Software Development Tool for Enabling Flawless Shuttle Enhancement Integration Area(s) of Significant Benefit Safety Performance Sustainability Operations Infrastructure • Description • Systems-level framework infused within a software development toolkit • Includes a language that provides correctness by built-in properties • Requirements analysis and traceability tool • Reverse engineering and testing tool • Automated documentation tool • Automated and complete code generation and self-testing tool • Systems-level interface definition and correctness verification tool • Technologies and Capabilities • Billions of dollars worth of existing legacy code can be directly and flawlessly transformed into modern code • Uses current computer languages running on modern computers, continually improved over time • All new system transformations and upgrades can be accommodated on a modular basis • Automatically reduces or eliminates system-level testing by requiring that the subsystem characterization be perfectly conducted and tested at the component level before integration • Provides a simplified control mechanism making ample use of priority displays Benefits and Impacts Obsolescence Reduction Risk Reduction Safety Improvement Cost Reduction Process Improvement Other (Ultra-High Operations Improvement Reliability) Performance Enhancement • POC, Cost, Schedule and Maturity • The project will be developed with the TRL 9 001environment • POC: Hamilton Technologies, Inc.(HTI) (617)492-0058 • Reduction in Criticality 1 Failure Rate of 8%

  2. Software Development Tool for Enabling Flawless Shuttle Enhancement Integration • Total Project Costs (Phase1): $ 110 M • Obsolescence & Feasibility: $ 28 M • Formulation: $ 62 M • Implementation: $ 20 M • Project Submitted By: Hamilton Technologies, Inc. (HTI) • (617)492-0058 • Note: Supplemental Information attached in MS Word document

More Related