90 likes | 184 Views
December 6, 2012 Public Meeting. Arizona Canal Multiuse Path Improvements Chaparral Road to Indian Bend Wash . AZ Canal Multiuse Path. Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to the Indian Bend Wash Project also includes: Pedestrian Bridges
E N D
December 6, 2012 Public Meeting Arizona Canal Multiuse Path Improvements Chaparral Road to Indian Bend Wash
AZ Canal Multiuse Path • Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to the Indian Bend Wash • Project also includes: • Pedestrian Bridges • Neighborhood Connections • Landscaping • Lighting • Public Art
AZ Canal Multiuse Path • Enhance mobility for bicyclists and pedestrians throughout the region • Provide connectivity to Papago Park, the Phoenix Zoo, the Desert Botanical Gardens, Tempe Town Lake and the Indian Bend Wash path system • The cities of Tempe, Phoenix and Scottsdale have been working to complete a 17-mile regional pathway system • Once constructed, this project will complete Scottsdale’s portion of the 17-mile loop • Total Project Budget of approximately $4M
AZ Canal Multiuse Path • Project Team • Olsson Associates and Jody Pinto • Partnership between the City of Scottsdale, Salt River Project and Scottsdale Public Art • Includes Federally Funding • Congestion Mitigation and Air Quality Funds • Follow the Federal Process • Required Clearances • Min. 2 year Design Process
AZ Canal Multiuse Path • Next Steps • Develop Master Plan and Artist concepts • Second Public Meeting – Winter 2013 • Design Review Board – Winter/Spring 2013 • Project Schedule • Complete design – Summer 2014 • Start construction – Fall 2014