TRF LIMITED (A TATA ENTERPRISE)

TRF LIMITED (A TATA ENTERPRISE). COAL HANDLING PLANT PACKAGE JHARLI.

julianna
Download Presentation

TRF LIMITED (A TATA ENTERPRISE)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRF LIMITED (A TATA ENTERPRISE) COAL HANDLING PLANT PACKAGE JHARLI

  2. 1. Wagon Tipplers with Side Arm Chargers- 4 sets2. Apron Feeders- 4 sets3. Reversible Stacker cum Reclaimer- 2 nos4. Crushers- 4 nos5. Screens- 4 nos6. Motorized Traveling Trippers- 6 nos7. Automatic Sampling system- 2 sets8. Passenger cum Goods elevators- 2 sets9. Utilities such as dust extraction, dust suppression and ventilation.

  3. Work Status- The highest building of CHP TP-5 has been completed in 58.0 mtr and Crusher House 37.0 mtr is 40 % completed approxly TRF is working on this project site 24X7. One 200 MT crane, one 100 MT crane, one 75 MT crane and Two 18 MT cranes have already been mobilized at the site, apart from seven 12 MT capacity hydra cranes. Mechanical work of Crusher House is also in progress Civil work of project is approxly near end.s The approximate manpower engaged at the site is 750 per day Mechanical erection of two wagon tippler is as under- Endring, Side Beam, Side Beam assembly, Cradle Assembly, Static Beweighbridge, Line shaft Assembly, Clamp, arm-4 nos., Hydraulic power pack, oil cooler pack is also erected till now.

  4. CHP LAYOUT

  5. OVERALL PLANNING AREAWISE/ ACTIVITYWISE FOR BALANCE WORK

  6. OVERALL GALLERY AND TERSTLE PROGRAMME FOR CHP

  7. NEXT

  8. Erection in Progress in Con-5A/B on March’09

  9. after some time

  10. CON-5A/B ERECTION

  11. Up Next is ………

  12. TP-5 ERECTION ON MARCH’09

  13. after some time

  14. TP-5 ERECTION ON APRIL’09

  15. after some time

  16. TP-5 ERECTION ON JANUARY’10

  17. Crusher House ERECTION

  18. Safety Tips:- 1. 100% Safety comply at our Civil Agency 2. 98% Safety comply at our Structural Agency 3. Safety Training held at site 4. Celebrated 4th March as Safety Day 9. Safety Banners and Safety Board distributed at site

  19. THANK YOU THANK YOU THANK YOU THANK YOU THANK YOU sunil sharma THANK YOU THANK YOU