An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WG3 – General information on work progress R. Vuillermet

  2. PP0 area connection Common reference and mechanical connection between type 1 services and flex Flex connectors on discontinuous boards Type 1 connectors on a single board

  3. Flex in PP0 area

  4. Type 1 services in PP0 area

  5. VI Beam Pipe Geometry Mark Gallilee Use to be 3 mm in the TDR !

  6. Construction of the scale one mock-up in building 180 Week #15 – Survey of the rail system – installation of the central tower of concrete block Week#16 – Installation of the minivans – installation of access stairs – installation of hand rails – Installation of central plate on the tower Week#17 – Installation of Bridge and scaffolding – installation of ITF – Survey and adjustment