1 / 9

Slide 1

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks(WPANs ) Submission Title: TG4m 4TV Closing Report for January 2013 Date Submitted: 17 January 2013 Source: Sangsung . Choi (ETRI) Contact: Sangsung . Choi (ETRI)

julius
Download Presentation

Slide 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks(WPANs) Submission Title:TG4m 4TV Closing Report for January 2013 Date Submitted: 17 January 2013 Source:Sangsung. Choi(ETRI) Contact: Sangsung. Choi(ETRI) Voice: +82 42 860 6831, E-Mail: sschoi@etri.re.kr Re: TG4m Closing Report for January 2013 Plenary Meeting Abstract: Closing Report for TG4m Session in Vancouver Purpose: TV White SpaceAmendment to IEEE 802.15.4 Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Slide 1 Sangsung Choi(ETRI)

  2. Meeting Goal This Week • Review the preliminary draft document • Discussion and resolutions on issuesand concerns in preliminary draft document • Hear and discussion of contributors’ presentations for TVWS regulations and Wi-SUN alliance • Joint meeting with 802.19 • Discussion on future efforts and next steps Sangsung Choi(ETRI)

  3. Meeting Slots Sangsung Choi(ETRI)

  4. TG4m Closing Report (1) • Review the preliminary draft document • Discussion and resolutions on issues and concerns in the preliminary draft document (docs. 15-12-0575-01 and15-13-0072-00) • Joint meeting with 802.19 • Presentations on overview and status of 802.19.1 and TG4m (docs. 19-13-0018-00 and 15-13-0034-00) • Discussion on issues regarding TG4m coexistence assurance document • Hear and discuss contributors’ presentations Sangsung Choi(ETRI)

  5. TG4m Closing Report (2) • Discussed coexistence assurance document • The CAD document was reviewed and finalized:doc. 15-13-0070-00. • Discussed future efforts and next steps • The WG letter ballot will be started in February 2013. • Coexistence assurance document will be accompanied with the final draft for the WG letter ballot. • Future time line was discussed. • Meeting was adjourned early. • Motion to adjourn the meeting • Moved by: Cristina Seibert Seconded by: Clint Powell • Motion carried by unanimous consent. Sangsung Choi(ETRI)

  6. TG4m Motion Move that the 802.15.4m Task Group seek 802.15 WG approval to start a WG Letter Ballot requesting approval to forward document #15-12-0575-01-004m, edited in accordance with the instructions in document #15-13-0072-00-004m, to Sponsor Ballot pending the completion and inclusion of the edits in the draft. Moved: Ed Callaway Seconded: Clint Powell Motion Passes (85%): 29/5/0 Sangsung Choi(ETRI)

  7. WG15 Motion Move that 802.15 WG start a WG Letter Ballot requesting approval to forward document #15-12-0575-01-004m, edited in accordance with the instructions in document #15-13-0072-00-004m, to Sponsor Ballot pending the completion and inclusion of the edits in the draft. Moved: Seconded: Sangsung Choi(ETRI)

  8. Future Plan/Timeline (1) • Form a New Task Group • Affirm new officers for TG4m September 2011 • Prepare the TGD November 2011, January 2012 • Finalizing the TGD & Call for Proposal March 2012 • Proposal Effort • Preliminary Proposals & Presentations May 6 2012 • Final Proposals July 9, 2012 • Proposal Presentations July 2012 • Merge Proposals September 2012 • Adopt Baseline September 2012 Slide 8 Sangsung Choi(ETRI)

  9. Future Plan/Timeline (2) • Drafting • Review Preliminary draft document November 2012 • Complete final draft before WG Letter Ballot January 2013 • Prepare Coexistence Assurance Document (CAD) January 2013 • Open WG LB for 30 day Posting of TG4m draft February 1, 2013 • Letter Ballot Comment resolution March 2013 • Balloting • 1st Recirculation & Comment Resolutions May 2013 • 2nd Recirculation & Comment Resolutions July2013 • 3rd Recirculation & Comment Resolution September 2013 • 1st SB Recirculation & Comment Resolutions November 2013 • 2nd SB Recirculation January 2014 • RevComApproval • EC approval July 2014 Slide 9 Sangsung Choi(ETRI)

More Related