1 / 5

Working notes

Working notes. Crossing current sheet events. Intense electric field located at the PSBL. Time 11/04/2012. About 12 crossing. Do the one from 0441UT first. 1 MinVari analysis for the crossing. Smoothing over 30s.

june
Download Presentation

Working notes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Working notes

  2. Crossing current sheet events • Intense electric field located at the PSBL

  3. Time 11/04/2012

  4. About 12 crossing. Do the one from 0441UT first. • 1 MinVari analysis for the crossing. Smoothing over 30s. • 2 Detrend the magnetic field data. Look at the waves on scales of 10~30s. MinVar analysis for the waves. (k vector) • 3 plot the E from the E_dotB=0 assumption. • May need high B sampling rate.

More Related