70 likes | 87 Views
This project involves replacing windows and painting the exterior of Wesleyan University's building. Tasks include removing through-wall fan, framing openings, insulating, sheathing, and patching to match stucco finish. It also includes sheathing with FR GWB, painting, removing garage doors, framing for a new door, insulating, and providing related hardware.
E N D
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 16 346 WASHINGTON STREET WINDOW REPLACEMENT / EXTERIOR PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-27-1
346 WASHINGTON STREET WINDOW REPLACEMENT / EXTERIOR PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-27-2
346 WASHINGTON STREET WINDOW REPLACEMENT / EXTERIOR PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-27-3
346 WASHINGTON STREET WINDOW REPLACEMENT / EXTERIOR PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-27-4
346 WASHINGTON STREET WINDOW REPLACEMENT / EXTERIOR PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-27-5
346 WASHINGTON STREET WINDOW REPLACEMENT / EXTERIOR PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-27-6
Remove through wall fan, frame opening, insulate, sheath and patch exterior to match stucco finish. Sheath interior with FR GWB, tape, prep and paint to match existing. Remove garage doors, frame opening to accept new 7’-6” x 3’-0” fiberglass door. Provide new threshold. Sheath interior and exterior. Insulate. Provide all related hardware. 346 WASHINGTON STREET WINDOW REPLACEMENT / EXTERIOR PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-27-7