1 / 16

From : .theicemage/maps/

ELT Instrumentation. ELT Instrumentation. Systems Engineering Design Optimization And Safety Conformity. From : www..theicemage.com/maps/. By Wolfgang Ansorge. RAMS-CON MANAGEMENT CONSULTANTS. · PROJECT MANAGEMENT · SYSTEMS ENGINEERING · QUALITY ASSURANCE · CONFIGURATION MANAGEMENT

kaden-lara
Download Presentation

From : .theicemage/maps/

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ELT Instrumentation ELT Instrumentation Systems Engineering Design Optimization And Safety Conformity From :www..theicemage.com/maps/ By Wolfgang Ansorge www.rams-con.de

  2. RAMS-CON MANAGEMENT CONSULTANTS ·PROJECT MANAGEMENT ·SYSTEMS ENGINEERING ·QUALITY ASSURANCE ·CONFIGURATION MANAGEMENT ·DOCUMENTATION ·RELIABILITY ·AVAILABILITY ·MAINTAINABILITY ·SAFETY Consultancy for Scientific Organizations ESO, CERN, MPE, MPG, Industrial Research www.rams-con.de

  3. Why this Presentation? 1 from presentation T.Herbst www.rams-con.de

  4. Why this Presentation? • European Commission FP7 Proposal: • Total Sum 72.700 M€ • One justification for the doubling of the R&D investments: • „The costs of research are rising, due in particular to the increased use of expensive instruments and infrastructure“ EP requirement: the improvement of scientific excelence must include the improvement of the scientific performance, efficiency and quality www.rams-con.de

  5. Why this Presentation now? Response Time • The introduction of modern project management • (PM) processes into the VLT Project started in the • beginningof the 90th of last century • it took 5-10 years to implement them at ESO • after 10-15 years the processes are widely used also in other astronomical projects www.rams-con.de

  6. Systems Engineering • It is the right time to implement competent Systems Engineering to • Identify the real User Needs • To transfer the User Needs into scientific–technical requirements • To identify the required instrument Reliability and Availability for scientific operations, the acceptable down time and Maintenance operations, and the Safety legislation to be followed. www.rams-con.de

  7. 100% 95% 75% 66% Life Cycle Costs 50% Preliminary design 25% Construction Commissioning Operation / Maintenance Final design Planning Life Cycle Stages of life cycle cost commitment www.rams-con.de

  8. Systems Engineering • ELT instrument systems need • integrated teams of experienced scientists, engineers, managers and administrators and • systematic processes to execute the projects in a most economic way: SE • There is no real difference in engineering or management of • projects in astronomy and • industrial projects of similar sophistication in aerospace, marine or other high-tech industries www.rams-con.de

  9. Systems Engineering • Industryhas implemented and is using the benefits of systems engineering since long time • to avoid and solve problems • withminimum of time, • with minimum costs, • with predefined quality, and • with lowest and controllable risk i.e. for profit optimization www.rams-con.de

  10. Systems Engineering www.rams-con.de

  11. Systems Engineering • Offer: • - SE Training • Preparation of a „standard“ ELT Instrument SE Plan • - Adaptation to actual requirements www.rams-con.de

  12. Design Optimization & Risk Minimization • Strict Project Phasing • Requirement Definition Phase • Preliminary Design / Conceptual Design Phase • (Feasibility Demonstrations) • Full Scale Design and Development / Final • Design Phase • Manufacturing / Construction Phase incl. • Assembly Integration and Verification • Installation & Commissioning Phase • Operation & Maintenance Phase • Disposal Phase www.rams-con.de

  13. Design Optimization & Risk Minimization • Strict Work Allocation & Control • Phase Specific Work Definition (beginning of project phase) • Scientific technical basis • Work package definition (WPD) including deliverables • Definition of available resources (human, financial, others) • Definition of schedule • Progress reporting (execution of work) • Scrutinizing of achievements (end of project phase) • Design Review • Correction measures www.rams-con.de

  14. Instrument Safety Compliance • Consideration of Basic Safety Requirements • Definition of applicable legislation • National, governmental regulations • Observatory specific requirements • Own safety regulations • Definition of verification requirements • Definition of Safety Conformity Assessment Process www.rams-con.de

  15. Instrument Safety Conformity • Offer: • introduction into safety / conformity assessment process • concept and design safety / conformity assesments www.rams-con.de