BASIC CIVIL AND ENVIRONMENTAL ENGINEERING For online examination

BASIC CIVIL AND ENVIRONMENTAL ENGINEERING For online examination. Q.1 Which of the following is not an application of surveying? a) preparing maps b) drawing plans and maps c) obtaining distance between stations d) Investigation of soils.

pavel
Download Presentation

BASIC CIVIL AND ENVIRONMENTAL ENGINEERING For online examination

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BASIC CIVIL AND ENVIRONMENTAL ENGINEERINGFor online examination

  2. Q.1 Which of the following is not an application of surveying? a) preparing maps b) drawing plans and maps c) obtaining distance between stations d) Investigation of soils

  3. Q.2 Type of soil or rock and its bearing capacity are studied within the area of civil engineering known as.. • Structural engineering • Surveying • Soil mechanics • Town planning

  4. Q.3 Efficient completion of a building as per specifications falls under.. a) irrigation engineering b) construction engineering c) structural engineering d) town planning

  5. Q.4 In the construction of a dam, civil has a engineer role for.. • Design of spillways and canals • Design of turbines and pumps • Design of hydraulic instrumentation • Agricultural products

  6. Q.5 Design of .. Of an expressway is a role of civil engineer. • Toll plazas • Toll plaza sheds • Speed-breakers • alignment

  7. Q.6 Role of civil engineer for an expressway project is mainly for.. • Pavement design • Basement design • Speed-breaker design • B.O.T.

  8. Q.7 Cost of a proposed building can be found out by using.. • Surveying • Quantity surveying • Geotechnical engineering • Structural engineering

  9. Q.9Which of the following is not relevant for construction of a bridge? • Surveying • Foundation engineering • Irrigation engineering • Structural engineering

  10. Q.10 For a dam project,.. Is not required as basic civil engineering area. • Surveying • Town planning • Geotechnical engineering • Earthquake engineering

  11. Q.11 If roads connect the state capital cities, they are abbreviated as.. a) O.D.R. b) V.R. c) W.BM.R. d) N.H.

  12. Q.12 Tools such as.. Are used for project management. • C.P.M. and P.E.R.T. • C.R.M. and P.E.R.S. • C.P.M. and C.E.R.T. • P.P.M. and C.E.R.T.

  13. Q.13 Design of superelevation, curves, tunnels, etc are covered in .. • Structural engineering • Construction technology • Transportation engineering • surveying

  14. Q.14 Quantity surveying includes two major areas as.. • Testing and measurements • Estimation and valuation • Evaluation and execution • Contracts and designs

  15. Q.15 .. Is not required for a dam project. • Environmental impact assessment • Catchment area study • Town planning • Geotechnical investigation

  16. Q.16 .. ( Of the following) is not a part of infrastructure development. • S.E.Z. • Expressway • Power plant • Multiplex theatre

  17. Q.17 The terms B.O.T. and S.E.Z. are relevant for.. • town planning • Structural engineering • Irrigation engineering • Project management

  18. Q.18 In the 21st century infrastructure projects; .. Approach is a must and essential. • Interdisciplinary • Extraordinary • Soft • B.O.T.

  19. Q.19 Which of the following is not an adverse situation for civil engineers in india? • Remote and deserted location • Desert or heavy rains. • Hills and undulating terrain • Sub-zero temperature with deciduous forest

  20. Q.20 lakes or rivers can be exactly located on map using .. • Town planning • Irrigation engineering • Surveying • Infrastructure development

  21. Q.21 Presence of ground-water, deformations in rock formations, etc. are studied under subject.. • Surveying • Irrigation engineering • Geotechnical engineering • Quantity surveying

  22. Q.22 Selection of type of superstructure and completion of work are covered in .. • Surveying • Construction engineering • Town planning • Project management

  23. Q.23 Gentle slope from center of road towards sides is called as.. • Camber • Super-elevation • Sub-grade • Cross-gradient

  24. Q.24 Top surface of a bituminous road is called.. • Bearing course • Base course • Sub-base course • Wearing course

  25. Q.25 Men,materials and money are optimally utilized in .. • Town planning • Project management • Quantity surveying • Construction technology

  26. Q.26 Main aim of transportation engineering is .. • Design of expressway • Proper maintenance of roads and railways • Traffic management within and outside towns • Safe, economical and rapid transportation

  27. Q.27 Minimum accidents and delays definitely indicate that .. Has been successfully and properly implemented. • Transportation engineering • Town planning • Surveying • Project mamagement

  28. Q.28 Mumbai to agra road is of the category .. • International highway • Freeway • National highway • State highway

  29. Q.29 .. Pavements have comparatively short life. • Rigid • Hybrid • Temporary • flexible

  30. Q.32 Study of pipe flows channel flows are covered in .. • Irrigation engineering • Dams • Fluid mechanics • Transportation engineering

  31. Q.33 Proper utilization of water for cropping and agricultural use is possible due to .. • Town planning • Irrigation engineering • Surveying • Fluid mechanics

  32. Q.34 Flood control and run-off studies are the aspects of .. • Town planning • Surveying • Project management • Irrigation engineering

  33. Q.35 Factor of safety and cross section of members are the important terms in .. • Town planning • Project management • Structural engineering • Fluid mechanics

  34. Q.36 Repairs and rehabilitation of buildings or building components are covered in .. • Town planning • Structural engineering • Construction technology • Quantity surveying

  35. Q.37 Soil testing is the most important aspect of .. • Irrigation engineering • Project management • Geotechnical engineering • Structural engineering

  36. Q.38 Reservoir operations for water supply for crops are managed by .. • Fluid mechanics • Irrigation engineering • Geotechnical engineering • Town planning

  37. Q.39 Failure of a building component is analysed using the knowledge of .. • Construction engineering • Project management • Quantity surveying • Structural engineering

  38. Q.40 Generally .. Is used for transportation in rural/remote areas. • O.D.R. • W.B.M.R. • Bituminous road • M.D.R.

  39. Q.41 Provision of industrial areas falls under .. • Infrastructure development • Town planning • Surveying • Project management

  40. Q.44 A flexible pavement may curve up or down according to the settlement of .. • Foundation • Base course • Sub-base • Sub-grade

  41. Q.45 In the road section, side-drains are generally provided .. • Below G.L. • In the sub-base • In the pavement • Above base course

  42. Q.46 Gauge of railway track means .. • Center to center distance between rails • Distance between outer faces of rails • Distance between inner faces of rails • Width of sleeper

  43. Q.47 Branch of fluid mechanics that deals with fluids at rest is known as .. • Fluid statics • Fluid statistics • Fluid dynamics • Fluid kinetics

  44. Q.49 Fluid kinetics includes study of .. • Fluids at rest • Fluids in motion along with the forces • Fluids in motion along without forces • Accleration and velocity of fluids

  45. Q.50 Fluid mechanics is defined as .. • Study of fluid properties • Study of fluids at rest • Study of fluids at rest and in motion under the action of various forces • Study of flows of fluids in pipelines

  46. Q.51 Identify the term which is not fit in the group of four. • Sleeper • Berth • Ballast • rail

  47. Q.53 W.B.M. and concrete pavement are examples of .. • Flexible and rigid pavement respectively • Flexible pavement • Rigid pavement • Rigid and flexible pavements respectively

  48. Q.54 Surveys done for lakes and rivers are known as .. • Hydrophobic surveys • Fluid mechanics • Drainage surveys • Hydrographic surveys

  49. Q.55 Data collection or measurements without direct physical contact with that objects is known as .. • Quantity survey • Remote sensing • Surveying • Contour survey

  50. Q.56 Length and angle measurements are the main aims of .. • Surveying • Levelling • Contouring • Remote sensing