Decadal Plan 2006-2015

Decadal Plan 2006-2015. Working Group 3.2 National Facilities Chair: Michael Drinkwater (UQ) Deputy chair: Naomi McClure-Griffiths (ATNF). National Facilities Working Group Members. Drinkwater, M (UQ) -chair Burton,M. (UNSW) Barden,S. (AAO) McConnell, D (ATNF) Sackett, P (RSAA)

Download Presentation

Decadal Plan 2006-2015

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Decadal Plan 2006-2015 Working Group 3.2 National Facilities Chair: Michael Drinkwater (UQ) Deputy chair: Naomi McClure-Griffiths (ATNF)

  2. National Facilities Working Group Members • Drinkwater, M (UQ) -chair • Burton,M. (UNSW) • Barden,S. (AAO) • McConnell, D (ATNF) • Sackett, P (RSAA) • Green, A (Syd) • Freeman, K (RSAA) • Storey, J (UNSW) • McGregor,P. (RSAA) • McClure-Griffiths, N (ATNF) –deputy chair • Caswell, J (ATNF) • Colless,M. (AAO) • Schmidt, B (RSAA) • Couch W. (UNSW) • Melatos, A (Mel)

  3. Terms of Reference • Compile a report that: • provides a stocktake of current or future proposed capabilities/resources in the area • identifies any new national or international opportunities/requirements in the area over the period 2006-15 • suggests strategies and the resourcing levels required to maximise these new opportunities. • Submit report to the NCA by April 30 2005 • Consult widely with all key stake holders (both national and international) in developing report

  4. Proposed Timetable • 24/11/4 First teleconference • 17/12/4 1st Town Hall meeting @UNSW • Identify missing items in summary sheets • Prepare survey questions • 2,4/2/05 2nd Town Hall meeting @ANU • Discuss priorities for national facilities • Confirm choices of any new facilities • 8/3/05 Circulate first draft of report • 15/3/05 3rd Town Hall meeting @Melbourne • Detail funding requirements and strategies • 1/4/05 Circulate final draft of report • 29/4/05 Submit report

  5. Proposed Timetable • 24/11/4 First teleconference • 17/12/4 1st Town Hall meeting @UNSW • Identify missing items in summary sheets • Prepare survey questions • 2,4/2/05 2nd Town Hall meeting @ANU • Discuss priorities for national facilities • Confirm choices of any new facilities • What is the link to the science drivers? • 8/3/05 Circulate first draft of report • 15/3/05 3rd Town Hall meeting @Melbourne • Detail funding requirements and strategies • 1/4/05 Circulate final draft of report • 29/4/05 Submit report

  6. National Facilities • Anglo-Australian Observatory • Australia Telescope National Facility • Australian Virtual Observatory • Australian National Institute for Theoretical Astrophysics (ANITA) • Research School of Astronomy & Astrophysics (WG3.3) • University of Tasmania Observatories (WG3.3) • Proposed: Centres of excellence program

  7. Tasks for Today • Compile a report that: • provides a stocktake of current or future proposed capabilities/resources in the area • identifies any new national or international opportunities/requirements in the area over the period 2006-15 • suggests strategies and the resourcing levels required to maximise these new opportunities. • Prepare survey questions • Consider specific question of the future of the AAO