1 / 10

Project 071103 CIM Test Development Process

Project 071103 CIM Test Development Process. Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011. CIM Test Process Overview. CIM Test Methodology compatible with IEC WG 14 CIM Users Group OpenSG And possibly MultiSpeak Test process defined, documented and repeatable

kalei
Download Presentation

Project 071103 CIM Test Development Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project 071103 CIM Test Development Process Author NameJohn Simmins Weekly Status and Planning Meeting1/25/2011

  2. CIM Test Process Overview • CIM Test Methodology compatible with • IEC WG 14 • CIM Users Group • OpenSG • And possibly MultiSpeak • Test process defined, documented and repeatable • Vetted with multiple utilities, vendors and user groups • Tests designed for multiple implementation environments (test only messages, implementation agnostic) • Legacy point-to-point • SOA with or without ESB • Various ESBs (WebSphere, WebLogic, TIBCO, GlassFish) • Tests openly available

  3. Schedule & SOW Task Deliverables

  4. Types of CIM-based Tests

  5. Basic Title and Text LayoutWith Subheads and Take-Away Box Subhead • This is first level bullet text • This is second level bullet text • This is third level bullet text Subhead • This is first level bullet text • This is second level bullet text • This is third level bullet text Subhead • This is first level bullet text This is a take-away box that fades in automatically

  6. Abstract Test Conformance Case Development Process with Example

  7. Abstract Interoperability Dev. Process

  8. Next Steps • Review and update sample abstract test case • Walked through with group 1/18/2011 • Instructions and procedures to connect up to an web service endpoints (e.g. MDMS & CIS) • POCs at Utilities/EPRI to coordinate testing • POCs at venders

  9. Status of Next Steps • Write detailed sample concrete test procedure • Exchange of security certificates • Certificate exchange • Code examples • Firewall setting • Permission from relevant IT organization • Port and IP address • Address Venders’ IPR concerns • ESB setup and cross-ESB configurations • POC information of people responsible for executing tests at Utilities, Venders and EPRI.

  10. Walkthrough of Interoperability Test Procedure

More Related