100 likes | 247 Views
Project 071103 CIM Test Development Process. Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011. CIM Test Process Overview. CIM Test Methodology compatible with IEC WG 14 CIM Users Group OpenSG And possibly MultiSpeak Test process defined, documented and repeatable
E N D
Project 071103 CIM Test Development Process Author NameJohn Simmins Weekly Status and Planning Meeting1/25/2011
CIM Test Process Overview • CIM Test Methodology compatible with • IEC WG 14 • CIM Users Group • OpenSG • And possibly MultiSpeak • Test process defined, documented and repeatable • Vetted with multiple utilities, vendors and user groups • Tests designed for multiple implementation environments (test only messages, implementation agnostic) • Legacy point-to-point • SOA with or without ESB • Various ESBs (WebSphere, WebLogic, TIBCO, GlassFish) • Tests openly available
Basic Title and Text LayoutWith Subheads and Take-Away Box Subhead • This is first level bullet text • This is second level bullet text • This is third level bullet text Subhead • This is first level bullet text • This is second level bullet text • This is third level bullet text Subhead • This is first level bullet text This is a take-away box that fades in automatically
Abstract Test Conformance Case Development Process with Example
Next Steps • Review and update sample abstract test case • Walked through with group 1/18/2011 • Instructions and procedures to connect up to an web service endpoints (e.g. MDMS & CIS) • POCs at Utilities/EPRI to coordinate testing • POCs at venders
Status of Next Steps • Write detailed sample concrete test procedure • Exchange of security certificates • Certificate exchange • Code examples • Firewall setting • Permission from relevant IT organization • Port and IP address • Address Venders’ IPR concerns • ESB setup and cross-ESB configurations • POC information of people responsible for executing tests at Utilities, Venders and EPRI.