1 / 21

A Tool for Healthy Change

A Tool for Healthy Change. Shaunna K. Burbidge, PhD Maria Vyas, AICP. Introduction and Overview. Communities Putting Prevention to Work (CDC) Utah Department of Health’s PANO Program Task Force for Bicycle and Pedestrian Issues How do we create healthy communities?.

kalil
Download Presentation

A Tool for Healthy Change

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Tool for Healthy Change Shaunna K. Burbidge, PhD Maria Vyas, AICP

  2. Introduction and Overview • Communities Putting Prevention to Work (CDC) • Utah Department of Health’s PANO Program • Task Force for Bicycle and Pedestrian Issues • How do we create healthy communities?

  3. Costs of Inactivity in Utah • Physical inactivity in Utah costs an estimated $256,673,411, or about $2,729 per person • Medical Care Costs: $27,805,033 • Workers Comp Costs: $498,136 • Lost Productivity Costs: $228,370,242

  4. Cost Savings If as little as 5% of inactive people became physically active, it could save an estimated $12,833,671 per year Physical Inactivity Cost Calculator (2006). East Carolina University, College of Health Education & Promotion. Available at http://www.ecu.edu/picostcalc/

  5. 1. Purpose of the Guide • Provide step-by-step instructions to assist communities in bicycle and pedestrian master planning • Not mandated, but supported and encouraged by the state

  6. How It Works • “Choose your own adventure” • Chapters organized by level • Beginning • Intermediate •  Advanced • Local examples • Resource guide

  7. Unique Features Examples from local jurisdictions Applicable resources Links to more information Suggestions for simplifying the process Reminders of times to get the public involved

  8. 2. Identifying Goals and Objectives • What is your motivation for creating a bike-ped master plan? • How do you get everyone on the same page? • Develop goals, objectives, and a methods for integrating the plan into existing planning framework

  9. 3. Inventory of Existing Conditions • What is already in place? • Infrastructure • Programs • Policies • Includes tools and resources for data collection • Identify strengths/deficiencies

  10. 4. Public Involvement • How do we effectively acquire and use feedback from the public? • Reasons for public involvement: • Inform, consult, involve, collaborate, empower • Examples of difference strategies • e.g., The pros and cons of three meetings versus one meeting

  11. 5. Analysis and Site Selection • Identifying locations for improvements • Evaluating problem areas • Advanced modeling techniques • Creating a list of target sites

  12. 6. Planning and Design Components • Policies • General policies • Land-use • Complete streets/systems • Form-based codes • School siting • Transit-oriented development • Zoning ordinances • Pedestrian policies • Building orientation • Crosswalk policies

  13. 6. Planning and Design Components...cont. Pedestrian Components • Controlled/uncontrolled location treatments • Geometric treatments • ADA compliance • Signing and striping • Traffic control devices • Corridor treatments • Streetscape enhancements

  14. 6. Planning and Design Components...cont. Bicycle Components • Site specific location treatments • Geometric treatments • Intersections • Parking treatments • Corridor treatments • Class I, II, III and more • Separated trails and bike boulevards

  15. 6. Planning and Design Components...cont. • Education • Bicycle ambassadors, bike rodeos, skills clinics, drivers education integration, school curricula, etc. • Encouragement • Bike to work week, green ribbon month, marketing campaigns, safe routes to school, walk to school day, bike buddies, etc.

  16. 7. Project Selection and Prioritization • Choosing key sites • Evaluating potential projects • Scoring criteria • Cost-benefit • Return-on-investment • Creating a prioritized list

  17. 8. Implementation • Estimating costs • Funding sources • Project phasing • Project fact sheets

  18. 9. Monitoring • Tracking progress • Ongoing funding needs • Building partnerships • Spot improvements • Maintaining public interest

  19. 10. Recognition Programs • Planning awards • Local awards • National awards • Implementation awards • Time to show off your hard work

  20. Upcoming Trainings, etc. • Health Impact Assessments (HIA) • Trainings in Salt Lake City and St. George (Jan-Feb 2012) • WFRC Complete Streets Forum • Trainings through MPOs coming soon…..

  21. Questions? • burbidge@metroanalytics.com m.vyas@fehrandpeers.com

More Related