Petroleum Engineering 406 Lesson 7 Well Control Shallow gas and Subsea Well Control
Read • Well Control Manual • Chapter 10,15
Shallow Gas • Many shallow gas sands are abnormally pressured • Total pressure (psi) may be low high EMW • e.g. FP = 452 psi (8.7 ppg eq.) at 1000’ • Drill with 9.0 ppg mud - 0.3 ppg overbalanced only 16 psi = 35’ of fluid
Shallow Gas • If we shut-in on kick • we lose circulation and possibly broach to surface
Shallow Gas Kicks • Pick up Kelly until lower kelly cock clears rotary • Shut down pumps • Check for flow • If flowing, open the down wind diverter valve • Close annular
Shallow Gas Kicks • Start circulating heavy mud with both pumps • If all heavy mud used up, pump all mud in mud pits • When this mud is gone, pump sea water • Continue until well is under control • may deplete • or bridge
Subsea Well Control • Floating rigs • BOP stack on sea floor • Communication from the wellbore to surface through riser
Subsea Well control Kill Line Choke Line Booster Line BOP
Subsea Well control • Riser is not designed to contain pressure • If the riser is evacuated, it will collapse • There is a telescoping joint at the top • Choke and kill lines to circulate kicks through • PVT and flow indicators affected by heave of vessel
Effect of choke and kill line • Possibly high CLFP during kicks • u-tube effect as gas hits choke line • Gas in top of BOP stack • Kill riser after killing well