An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. API WIWC TG-5 • Well Intervention Well Control • Task Group • Summer Conference Update • Alex Sas-Jaworsky P.E • Chairman

  2. API WIWC TG-5 • Technologies Addressed • Coiled Tubing • Snubbing/Hydraulic Workover • Wireline (Slickline and E-Line)

  3. API WIWC TG-5 • Standards Developed • Recommended Practice 16ST Coiled Tubing Well Control Equipment Systems First Edition – March 2009

  4. API WIWC TG-5 • 2013 RP 16ST TG Membership • Operators (3) • CT Vendors (5) • Manufacturers (3) • Consultants (2) • Regulatory (1)

  5. API WIWC TG-5 • Current Activities • 5-Year Review of RP 16ST Further AlignRP 16ST Standards with Established SC16 Standards to Maintain Consistency Where Possible

  6. API WIWC TG-5 • RP 16ST Review Priority • Well Control Equipment Operating Systems (Pumps & Accumulators) • Conduct Testing to Establish Basis for Minimum Ram Actuation Times • Align with Spec 16D (where possible)

  7. API WIWC TG-5 • RP 16ST Review Priority • Conducted Preliminary Testing of Hydraulic Power Fluids at Various Temperatures to Establish Basis for Minimum Ram Actuation Times on February 6, 2013

  8. API WIWC TG-5 • RP 16ST Review Priority • Held TG Meeting on February 7, 2013 to Review Test Results and Plans for Continued Testing of Alternate Fluids. • Currently Planning Further Fluid Tests in Third Quarter, 2013

  9. API WIWC TG-5 • RP 16ST Review Priority • Well Control Flow Path Systems (Choke and Kill Lines & Flow Control) • Work with TG-2 on Spec 16C to Ensure Consistency Across Services

  10. API WIWC TG-5 • RP 16ST Review Priority • Coiled Tubing Well Control Equipment Manufacturing Standards • Spec 16A Covers 7-1/16”+ Stacks • Guidance for Manufacture of 5-1/8”, 4-1/16”, 3-1/16”, 2-9/16” Stacks?

  11. API WIWC TG-5 • RP 16ST Review Priority • Well Control Equipment Repair & Remanufacture Issues (small rams) • Reference STD 16AR (if possible, or) • Establish Recommendations Within RP 16ST Consistent with STD 16 AR

  12. API WIWC TG-5 • RP 16ST Review Priority • Conduct Line-By-Line Review of Remainder of RP 16ST to Correct Typos, Reconfirm Value of Standards and Clarify Performance Expectations

  13. API WIWC TG-5 • RP 16ST Review Priority • Complete Review and Submit 2nd Ed. of RP 16ST for Letter Ballot in 1st Quarter, 2014.

  14. API WIWC TG-5 • Future WIWC-TG Activities • Initiate New Work Item to Develop RP for Snubbing Well Control Standards • RP to Address Sustained Pressure Control Issues, Including Workstring Integrity (tube buckling & connections)