API WIWC TG-5 • Well Intervention Well Control • Task Group • Summer Conference Update • Alex Sas-Jaworsky P.E • Chairman
API WIWC TG-5 • Technologies Addressed • Coiled Tubing • Snubbing/Hydraulic Workover • Wireline (Slickline and E-Line)
API WIWC TG-5 • Standards Developed • Recommended Practice 16ST Coiled Tubing Well Control Equipment Systems First Edition – March 2009
API WIWC TG-5 • 2013 RP 16ST TG Membership • Operators (3) • CT Vendors (5) • Manufacturers (3) • Consultants (2) • Regulatory (1)
API WIWC TG-5 • Current Activities • 5-Year Review of RP 16ST Further AlignRP 16ST Standards with Established SC16 Standards to Maintain Consistency Where Possible
API WIWC TG-5 • RP 16ST Review Priority • Well Control Equipment Operating Systems (Pumps & Accumulators) • Conduct Testing to Establish Basis for Minimum Ram Actuation Times • Align with Spec 16D (where possible)
API WIWC TG-5 • RP 16ST Review Priority • Conducted Preliminary Testing of Hydraulic Power Fluids at Various Temperatures to Establish Basis for Minimum Ram Actuation Times on February 6, 2013
API WIWC TG-5 • RP 16ST Review Priority • Held TG Meeting on February 7, 2013 to Review Test Results and Plans for Continued Testing of Alternate Fluids. • Currently Planning Further Fluid Tests in Third Quarter, 2013
API WIWC TG-5 • RP 16ST Review Priority • Well Control Flow Path Systems (Choke and Kill Lines & Flow Control) • Work with TG-2 on Spec 16C to Ensure Consistency Across Services
API WIWC TG-5 • RP 16ST Review Priority • Coiled Tubing Well Control Equipment Manufacturing Standards • Spec 16A Covers 7-1/16”+ Stacks • Guidance for Manufacture of 5-1/8”, 4-1/16”, 3-1/16”, 2-9/16” Stacks?
API WIWC TG-5 • RP 16ST Review Priority • Well Control Equipment Repair & Remanufacture Issues (small rams) • Reference STD 16AR (if possible, or) • Establish Recommendations Within RP 16ST Consistent with STD 16 AR
API WIWC TG-5 • RP 16ST Review Priority • Conduct Line-By-Line Review of Remainder of RP 16ST to Correct Typos, Reconfirm Value of Standards and Clarify Performance Expectations
API WIWC TG-5 • RP 16ST Review Priority • Complete Review and Submit 2nd Ed. of RP 16ST for Letter Ballot in 1st Quarter, 2014.
API WIWC TG-5 • Future WIWC-TG Activities • Initiate New Work Item to Develop RP for Snubbing Well Control Standards • RP to Address Sustained Pressure Control Issues, Including Workstring Integrity (tube buckling & connections)