Meeting Agenda • 31 March 2014 • 08:30 – 09:30: CCSDS Plenary • 09:30 – 12:30: Systems Engineering Area (SEA) Plenary • 13:30 – 18:30: Security WG • Welcome, introductions, logistics, agenda review • Review results of Fall 2013 (San Antonio) meeting • Status of documents, action items • Charter review (if required) • EUMETSAT Overview (Texier) • Threat book revision review (Weiss) • Additional Threats (Sheehe) • Working Group Dinner
Meeting Agenda (cont) • 1 April 2014 (08:30 – 18:30) • Network Layer Security Draft Review (Weiss) • IPsec Testing + Yellow Book Status (Sheehe) • Network layer security for non-IP environments Fischer/Aguilar-Sanchez) • Key Management Blue Book (Fischer/Aguilar-Sanchez) • KM for SDLS extended procedures • Link Layer Security Update Discussion (Biggerstaff/Weiss/Aguilar-Sanchez) • Other areas of discussion • Physical Layer Security (Aguilar-Sanchez) • Proposed new areas of work • 2 April 2014 • 08:30-18:30: Space Data Link Security WG • 3 April 2014 • 08:30-12:30: Space Data Link Security WG • 15:00-18:00: SEA Wrap-up Plenary
Executive Summary • Attendees from UK Space Agency, ESA/ESTEC, ESA/ESOC, DLR, CNES, China BITTT, EUMETSAT, NASA/JSC, NASA/GRC, and NASA/JPL. • No charter or framework changes were required. However, discussion on SecWG involvement in document reviews (see resolutions). • Reviewed action items from San Antonio. Carrying several forward and all others were completed. • EUMETSAT provided overview presentation. • Reviewed revision of Threat GB. Several presentations by Chuck Sheehe on additional threats to be included in revised document. Comments & discussions will be folded into next revision. • Reviewed revised draft of Network Layer Security adaption profile. Section 2 was re-written per comments. A few more changes/refinements needed. NASA/GRC is writing the Yellow Book and will provide feedback into the Blue Book. CNES is still trying to establish a testing environment to test with NASA/GRC. • Physical Layer Security discussion from ESA/ESTEC as a potential future endeavor. • Discussed outstanding SDLS RID (re: IV and AAD) to find way forward for RID disposition. • Reviewed Key Management Extended Procedures document. • Discussed possible new work areas: physical layer; CFDP, application layer. • SDLS: reviewed “final” protocol (Red-4v2), extended procedures, and GB.
Summary of Goals and Deliverables • Discussed SecWG role in ensuring other working groups are paying attention to and working towards secure protocols. • KM Magenta Book for symmetric KM is progressing (as is the KM Blue Book for SDLS). • Reviewed Threat Green Book revisions. Discussed new threats to be added to the document (cognitive radios, hosted payloads, supply chain management). • Reviewed network layer security “adaptation” profile draft. ESA will investigate how IPsec might be used over non-IP protocols (action carried over from last meeting). NASA/GRC to write Yellow Book and perform testing. CNES will hopefully also perform testing. • Discussed Physical Layer Security. • Reviewed SDLS progress and dispositioned IV related RID in SecWG • Introduction to EUMETSAT (and new member).
SEA Area MID-TERM REPORT SUMMARY TECHNICAL STATUS • Security WG • Goal: • Working Status: Active _X_ Idle ____ • Summary progress: documents actively being produced: Key Management MB, Threat GB revision, Network Layer BB. All docs green. • Progress since last meeting: threat GB rev, network layer security revision, KM MB progress. • Problems and Issues: None
Open Issues • Status of CWE mailing lists: • Most CWE mailing lists can be obtained by anyone w/o a CWE account • WG’s should be encouraged to turn this off – or the secretariat should default this to off.
Resource Problems • Resources had been adequate to perform the current tasks although personnel have only limited time percentage to apply to CCSDS tasks.
Risk Management Update • Must ensure that the current trend of additional resources remains and that resources don’t shrink.
Cross Area WG / BOF Issues • Joint meeting with Space Data Link Security WG • SDLS has joint meeting with Next Generation Space Link WG • Advice on hash revision to SLE (from SHA-1 to SHA-2) • Continued interaction with DTN and Spacecraft Monitoring & Control although no joint meeting in Noordijkerhout.
Resolutions to be Sent to CESG and Then to CMC • Resolution: The SecWG will be actively engaged in the review of all Red Books: • Levels of involvement range from cursory examination of the Red Books under development, to active involvement in the development of the books. • Resolution:All CCSDS document editors will reach out, early in the development of the book to the SecWG to reduce downstream security issues. • Resolution:Security shall be addressed in all new project initiations. All new projects should consider the extent to which security is relevant. Considerations will be documented in the project initiation request.