1 / 10

Status of NERON/HCN-M for The Committee for Climate Analysis, Monitoring, and Services (CCAMS)

Status of NERON/HCN-M for The Committee for Climate Analysis, Monitoring, and Services (CCAMS). John Hahn NWS Office of Science and Technology. General Overview – Program Description. HCN-M evolved from the former NERON (NOAA Environmental Real Time Observing Network Program).

kaoru
Download Presentation

Status of NERON/HCN-M for The Committee for Climate Analysis, Monitoring, and Services (CCAMS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status ofNERON/HCN-MforThe Committee for Climate Analysis, Monitoring, and Services (CCAMS) John Hahn NWS Office of Science and Technology

  2. General Overview – Program Description • HCN-M evolved from the former NERON (NOAA Environmental Real Time Observing Network Program). • NERON was redirected by the NEP to modernize the Historical Climate Network (HCN-M) • HCN-M will sustain the Nation’s regional temperature and precipitation climate record • Modernize 1,000 of the existing 1,221 HCN stations to collect temperature and precipitation data through automation • Provide for expansion capacity to collect other data sets (e.g., National Integrated Drought Information System, NIDIS, dataset) • Address the gaps in the HCN including: data quality, data availability, and aging technology • The primary requirement for the HCN is to produce quality climate observations for sustaining the nation’s regional climate record in support of monitoring and assessment of the surface climate.

  3. General Overview – HCN Today Gaps • Data quality • Attrition of current volunteers 1 • Manual process susceptible to human errors in observing and documentation1 • Significant number of stations no longer meet siting requirements due to overgrowth and urbanization 2 • Data availability • Due to manual process, not available for up to 90 days1 • Technology • Aging equipment and maintenance issues 1 • Not expandable to cost effectively add new sensors 1 Current Capabilities • The HCN is an NWS operated sub-network of COOP stations • Network created to compile data suitable for detecting and monitoring regional climate variability • Stations must have >80 years of continuous data record with the majority having >100 years • 1,221 stations identified by NCDC • Observations • Daily observations of Temperature and Precipitation recorded manually by volunteers • NCDC publishes data within 30-90 days • Uses • Climate assessments, state of the climate reports, and commercial sector • Specialized scientific analyses 1 National Research Council. 1998. Toward a New National Weather Service. Future of the National Weather Service Cooperative Observer Network. Washington, D.C. pp. 12-18 2 Christopher A. Davey and Roger A. Pielke Sr.. 2005: *Microclimate Exposures of Surface-Based Weather Stations: Implications For The Assessment of Long-Term Temperature Trends.* /Bulletin of the American Meteorological Society/: Vol. 86, No. 4, pp. 497–504

  4. General Overview – Key Customers and Stakeholders • Internal • NCDC climate record archive • OAR analyses and NIDIS Project • NWS climate products and services • External • U.S. Departments Agriculture and Interior (Stakeholders) • Private, Public and Academic members of the weather enterprise communities • State climatologists • Consulting meteorologists and climatologists • Design standards community (e.g., engineering, construction, energy) • Water resource managers

  5. General Overview –Draft Locations for HCN-M Sites

  6. Overview of Project • Project will follow the OSIP and NOAA KDP processes as a Major Project. • Level 1 Requirements Document defines the scope. • Developed through collaboration between NESDIS/NCDC, NWS/OCWWS, OOS and OS&T. • Delivered to NOSC for review and comment. • Climate is the focus (climate requirements are primary) • Input from all primary stakeholders is required for success • Climate Community in NOAA (NCDC, CPC, OCWWS/CSD) • Regions

  7. Level 1 Requirements Document (Final Draft) • Level 1 document distributed to NOSC for review on September 28, 2007 • HCN-M consists of 1000 sites for the purpose of automation of air temperature and precipitation observations and transmittal • 5 minute collections of temperature (+/- 1 deg) & precipitation (+/- .02 in) • Minimum daily transmittal of data • Design for expansion (snow, soil moisture, etc.) • Raw data distributed to MADIS and NCDC

  8. Performance Metric • The performance of HCN-M will be measured by the improvement in the percentage of the explained variance of both regional temperature and precipitation. • The target is to have 95% variance explained for temperature and precipitation with the completion of ~1,000 sites. The following table demonstrates the relationship between the number of sites and the expected improvement in the performance measures.

  9. Project Schedule Stage 4: Acquisition Plan Dev O&M Plan Dev Transition Strategy Dev Acquisition Plan Stage 3: Recommend Solution Site Surveys Acquisition Strategy Completion System Design Cost Benefit Analysis Stage 2: Alternatives & Develop Plan Initiate Site Surveys Develop RFI Develop ConOps Establish IWT Project Planning Documents Stage 1: Identify Need Jan 07 Jan 08 Sep 08 Sep 09 OSIP Gate 2 Complete OSIP Gate 3 Complete OSIP Gate 4 Complete OSIP Gate 1 Complete

  10. Next Steps • Continue the OSIP process and KDP Gate reviews • KDP 2 January 2008 • KDP 3 September 2008 • Develop Acquisitions Strategy and Plan for Site Surveys • Work with SCC/RCCs to investigate their conducting site surveys and compiling meta data • Finalize the Integrated Work Team • Conduct Risk Assessment and develop Risk Management Plan • Develop WBS, Project Milestones and Schedule for FY08