An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DSF test bench update A. Francescon ITS cooling meeting 13.09.11

  2. First tests60 μm filter characterization and thermosiphon results comparison Dp [bar] Comparison between New results and thermosiphon For 60 um filter @ 0 W Flow [g/s]

  3. Error range evaluation Dp [bar] Example: +/- 20% error Flow [g/s]

  4. Next tests schedule • Dp variation on 60 μm filters (error range evaluation) (expected required time: 1 day); • Differences in capillaries pressure drop (exp. req. time: 2 days) • Effect of the fluid thermodynamical properties on the pressure drop over the capillaries and the sector (thermal bath) (exp. Req. time: 2 days); N.B. For this test we need to regulate the gas pressure; After that we could start with powder tests (the two filters are therefore required).

  5. Powder tests • Dp evaluation for different powder sizes • Cleaning procedure optimization • Test of ultrasound solutions (Rosario)

  6. Possible planning • Installation of the filters (while the line is empty); • Carrying out of tests; • Plant stop to carry out remaining installations on the plant (dummy load, flow meter…).