1 / 1

MAPP

- Areas. - Tie Lines. ** not reflective of the transmission limitations -- it is reflective of a CNF policy decision on how much Ontario should be relied upon as a source in the base case. Upper Peninsula. O*MW. Ontario. 350 MW. 350 MW. 0** MW. METC. TN. 2850 MW. ITC. MAPP.

kare
Download Presentation

MAPP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. - Areas - Tie Lines ** not reflective of the transmission limitations -- it is reflective of a CNF policy decision on how much Ontario should be relied upon as a source in the base case Upper Peninsula O*MW Ontario 350 MW 350 MW 0** MW METC TN 2850 MW ITC MAPP 350 MW 600 MW 3350 MW TN 3000 MW 2800 MW TN 3200 MW MAIN 2900 MW MAAC 3050 MW VACAR TVA • The MMWG case doesnot show a line

More Related