1 / 12

STT rack space needs

STT rack space needs. educated guess of STT requirements. TC is asking for. a) How many U rack space do you need at the detector? b) How many U rack space do you need in the supply level (E10) and the DAQ/readout level (E20) of the counting house?

karli
Download Presentation

STT rack space needs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STT rack space needs educated guess of STT requirements

  2. TC is asking for a) How many U rack space do you need at the detector? b) How many U rack space do you need in the supply level (E10) and the DAQ/readout level (E20) of the counting house? c) Do you need any equipment close to the detector in non-standard (non-rack) housings? At which minimal distance to your detector and with which dimensions? The dead line to provide info is next TB in Bochum

  3. STT numbers • 4636 Straw tubes arranged in planar layers (24-27) • Time readout (isochrone radius) drift time ~ 200 ns (B=2T) req. electronic resolution < 1 ns sensitivity (threshold) ~ 2 fC • Amplitude readout (energy loss) • Straw tube capacitance: ~ 10-15 pF (9 pF/m) impedance: 373 Ώ inductance:1.24 μH/m • Gas volume: ~ 1040 l • mixture 90Ar + 10CO2 xy-view

  4. Readout scheme • FEE anlog: • Preamp+ Shaper+ BLR + Discriminator • Analog output needed for dE/dx measurement? • Digital Boards: • Multihit TDC: Time measurement + TimeOverThreshold (TOT) for chargemeasurement OR/AND analog signalprocessing via FADC • Zerosuppression & Hit detection. Slow /Run/Data flowcontrol • Data Concentration: • gathering and sorting of hitsmarked by timestamps in epoques (i.e 500 s bunch) • nGbit/s Optical serial link Located on the STT FE DB Located on racks outside

  5. FEE Boards Tentative layout of FEE boards. Total # 592 includes some spare channel. Cooling is not yet excluded.

  6. Digital+Concentration Boards These functions are implemented in TRBv3. • 5x Lattice ECP3 150 FPGAs • 4 edge devices up to 60 TDC ch • 1 central for control • Flash ROMs for each • 4x 208pin QMS connectors • Small Addons • 2x80pin connectors • Large Addon (i.e. ADC) 24 TRBs will instrument all STT Which kind of Crates? 9U, 6U How many?

  7. HV system How much space? • Based on Wiener Mpod (8U) - universal multi-channel LV/ HV power supply system • Controllerwith Ethernet, CANbus, USB interface, and • interlock; • Web-ready and TCP/IP communication via SNMP, OPC server; • LabView software support; • LV and HV modules freely combinable; • High Voltage modules (ISEG) with 8, 16, 32 channels of from 500V to 10kV, floating or common ground; • Low Voltage floating modules with 8 channels of 10A / 50W max. with 8V, 16V, 30V, 60V ranges • - PXI platform from National Instruments as I/O • Controller • Embedded controllers with Intel CPUs, hard drive, • memory, Ethernet, video, serial, USB, GPIB; • - OS support: Windows, LabView Real-time, Linux; • - more than 1500 PXI products (Multifun. DAQ, FPGA)

  8. Slow Controls ARM-processors (CPU based on simplified instruction sets) will control different field points (gas/pressure controllers, temp. sensors, etc. )

  9. DCS and HV systems Regarding rack space for the DCS and HV System: - ethernet switch: 1 U - epics gateway server : 2U - NI PXI Crate: 4U - MPOD Bin: 9U ________________ total: 16U

  10. Cables and supply lines • - The STT readout ASIC will provide LVDS differential outputs. • It will have 8 channels/chip and 2 control lines. Therefore for each chip we will need a 10 pairs flat cable.Total # of flat cables is 296x2. • These cables should be connected to patch-panels locate outside the magnet • ~1240mmx1200mmx150mm • Forthe gas weforesee 24 gas supplylines, 224 gas pipes (in-/outlet). • Weneed also 40 HV cables. • Howmanycontrollinesfortemperatureandpressure? • Thresholdsettingandtestpulsesfor FEE arealreadyincluded?

  11. Timeline and Milestones • Prototype/Pre-series testing complete, production readiness • Mass production • Ready for installation • Ready for beam (commissioning) 2014 2015-2016 2017 2018

More Related