An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report from WG3 (Cryomodule) and objectives of the meeting V.Parma, CERN TE-MSC 3rd SPL collaboration meeting, CERN 11-13 November 2009

  2. Goals & Motivation Goal: • Design and construct a full-scale cryomodule prototype (Part of the SPL Design Study for a Project Proposal in 2012) Motivation: • Demonstrate the construction capability, CM with β=1 cavities and SC quadrupoles; • Validate and improve design and construction features • Learning of the critical assembly phases • Enable RF testing on a multi-cavity assembly in real operating conditions • Validate operation issues cryogenic cooling principles and acquire experience • Support cost estimates 3rd SPL collaboration meeting, CERN 11-13 November 2009

  3. Working group members New entry 3rd SPL collaboration meeting, CERN 11-13 November 2009

  4. Agreed external contributions for cryomodules New New 3rd SPL collaboration meeting, CERN 11-13 November 2009

  5. Work progress • Regular WG meetings since May • Web page: https://twiki.cern.ch/twiki/bin/view/SPL/CryoModules • Topics covered: • Cryomodule longitudinal integration study • SPL mechanical layouts • Cryogenics • Close collaboration with WG2 (cavities): • Workshop on Mechanical issues of SPL cavities/cryomodules: http://indico.cern.ch/conferenceDisplay.py?confId=68968 • Workshop on Cryogenic and vacuum sectorisation of the SPL: http://indico.cern.ch/conferenceDisplay.py?confId=68499 3rd SPL collaboration meeting, CERN 11-13 November 2009

  6. Cryo-modulelongitudinal integration study (β=1) +

  7. Inter-cavity space St.steel flange/bellows 100 Integration of CEA tuner

  8. SPL mechanicallayouts 5 Gev version (HP): 23 x β=1 modules + 2 de-modulator modules extraction regions to Isolde and Eurisol 10 x β=.65 modules length = 121 m  HP-SPL length ~500 m 4 Gev version (LP): 18 x β=1 modules + 2 de-modulator modules extraction regions to Isolde and Eurisol  LP-PL length~ 430 m T. Renaglia

  9. Longitudinal mechanicallayouts «Continuous» vs. « segmented» cryostat SPL layouts Continuous cryostat "Compact" version (gain on interconnections):  5 Gev version (HP):SPL length = 485.14 m (550 m max availablespace) "Warm quadrupole" version (withseparatecryoline):  5 Gev version (HP):SPL length = 535.92 m (550 m max availablespace)

  10. Subjects for this collaboration meeting(in WG3 and common sessions) • Sectorisation layouts: options and impact on cryo-modules • Dimensions, pressures and temperatures of cryogenic circuits • Cryo-module longitudinal layouts • Required interfaces for cryostat design/integration • Mechanical layout and technical specification of the cavity-tuner-He-tank unit • Sensitivity study on the SPL : definition of alignment tolerances, diagnostics and correction systems • SPL coupler options and integration requirements • Warm quadrupolemagnets • Cryo-modules for ERL at BNL 3rd SPL collaboration meeting, CERN 11-13 November 2009

  11. Schedule for SPL prototype Cryomodule ready for testing uncompressible today Requires availability of “plug-compatible” tested cavities/vessels 3rd SPL collaboration meeting, CERN 11-13 November 2009

  12. Objectives • Warm or cold magnets? • Technical spec. and interfaces for cavity helium vessel and tuner • Coupler requirements and assembly constraints • Alignment requirements for cavities and quads • Dimensions , T and P for cryomodule cryogenic lines (depending on cryogenic scheme adopted) • Prepare ingredients for: • The preparation of the technical specification for the prototype cryomodule • And refining the objectives for the prototype cryomodule program 3rd SPL collaboration meeting, CERN 11-13 November 2009

  13. Thank you for your attention! 3rd SPL collaboration meeting, CERN 11-13 November 2009