Engineering Rate Enablers – Aft Body 15) Section 47 PAX Floor Grid Build-Up and Installation

BSC DE: Kyle Starck Status Date: 07/13/12 Approved by: H . Harr LCPT POC: L. Curtright. Engineering Rate Enablers – Aft Body 15) Section 47 PAX Floor Grid Build-Up and Installation. Project Lead: Kyle Starck. Customer: Mark Wigant / CS280. DE Status: 1) 100% ( ACD 3/1/12)

kat
Download Presentation

Engineering Rate Enablers – Aft Body 15) Section 47 PAX Floor Grid Build-Up and Installation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BSC DE: Kyle Starck Status Date: 07/13/12 Approved by: H. Harr LCPT POC: L. Curtright Engineering Rate Enablers – Aft Body15) Section 47 PAX Floor Grid Build-Up and Installation Project Lead: Kyle Starck Customer: Mark Wigant / CS280 DE Status: • 1) 100% (ACD 3/1/12) • 2) 100% (ACD 5/11/12) • 3) 90% (ECD 5/196/11 TBD) • 3.1) 100% (ACD 6/6/12) • 3.2) 100% (ACD 6/11/12) • 3.3) 100% (ACD 6/13/12) • 3.35) 50% (ECD 6/196/27TBD) • 3.4) 0% (ECD 6/136/206/27 TBD) • 4) 0% (ECD5/24 7/13/12) • 5) 0% (ECD5/31 7/16/2012) • 6) 0% (ECD5/31 7/16/2012) • 7) 0% (ECD6/4 7/20/2012) • 8) 0% (ECD6/8 7/29/2012) Description / Problem Statement: • Locating floor grid properly per requirements to facilitate successful FA&D join results in excessive gaps between floor beam and frame fittings. • Current Floor Grid Assy tolerances fail to produce a product that will comply with end item requirements during installation. Target: • Reduce flow in Cell 280 by .25 day. Reduction of 76 man hours • Eliminate NC EPD, and 3.25 days of FAD rework during Section 46-47 join Proposal / Closure Criteria: • Incorporate improved datum and tolerance structure for floor grid assy • Increase MBD shim allowance between floor beam and frame fittings at STA 1618, 1644, 1670 and 1695 • Incorporation point: A/C 100 Process Info: • ELR 072169 – Rejected (no data) • ELR 072438 – Submitted with Data • ELR 073916 – Revised w/ Bus Case Last Now DE Project Y R Y R Risk: Cost estimates from Supplier Management Accomplishments: • Laser measurement of LN 82 frame fittings. • Gap measurements after floor instl of LN 82. Help Needed: • Need estimates from Supplier Management on costs for CDZ or MVO to build or replace tooling to deliver usable frames DE Plan: • 1) Floor grid installation dimensional analysis (ACD 3/1/12) • ELR 072169 and 072438 initiated by ME (ACD 3/15/12) • 2) Business Case for Aft Body impact (ECD 5/11/12) • 3) Evaluate increased shim allowance for 8 locations (ECD 5/19/12) • 3.1) Tech SAM Review (ECD 6/6/12) • 3.2) Compile package for existing frame RCA data (ECD 6/11/12) • 3.3) Evaluate need for workshop to resolve frame issue (ECD 6/13/12) • 3.35) Investigate costs for implementation of Frame corrective action (ECD 6/19/12) • 3.4) Return to Tech SAM for final determination (ECD 6/13/12) • 4) Preliminary Stress Assessment (8 locations) (ECD 5/24/12) • 5) Create Change Package / DE DWS (ECD 5/31/12) • 6) Baseline DE plan (ECD 5/31/12) • 7) Receive ERB Approval (ECD 6/4/12) • 8) Receive CCB3 Approval (ECD 6/8/12) LN 100 DE Release 3 1 7 2 6 4 8 5