300 likes | 406 Views
Product Quality- Future Road Map. Dr. R.K. Malhotra Executive Director (R&D) Indian Oil Corporation Ltd. Road Map-Background. Expert committee constituted to recommend Auto Fuel Policy for the country on 13.9.2001 Report submitted in August 2002
E N D
Product Quality- Future Road Map Dr. R.K. Malhotra Executive Director (R&D) Indian Oil Corporation Ltd.
Road Map-Background • Expert committee constituted to recommend Auto Fuel Policy for the country on 13.9.2001 • Report submitted in August 2002 • Govt. announced Auto Fuel Policy in October 2003
Objective of the Policy To recommend an Auto Fuel Policy for the country and devise roadmap for its implementation To recommend suitable auto fuels and the specifications thereof To recommend attributes of automobile technologies To recommend monitoring and enforcement measures
Roadmap as per Auto Fuel Policy Adoption of Euro-II, Euro-III & Euro-IV equivalent Bharat Stage(BS) Emission Standards and Fuel quality New vehicles except 2-3 wheelers: Entire country: BS-II 1.4.2005 BS-III 1.4.2010 11 major cities: BS-III 1.4.2005 BS-IV 1.4.2010
Roadmap as per Auto Fuel Policy Emission norms for new 2-3 wheelers to be uniform all over the country: BS-II 1.4.2005 BS-III preferably from 1.4.2008 but not later than April 2010 These schedules would be reviewed in the year 2006, after BS-II (Euro-II equivalent) norms are implemented.
Major Changes in Gasoline Specification ParameterBIS-2000BS-IIBS-IIIEU-IV Eq. Sulphur ppm max. 1000/500 500 150 50 Benzene Vol%max. 5/3 3 1 1 Aromatics Vol% max. - - 42 35 Olefins Vol% max. - - 21(18#) 21(18#) RON 88/93(#) 88/93(#) 91/95(#) 91/95(#) (#) Premium grade
Major Changes in Diesel Specification ParameterBIS-2000BS-IIBS-IIIEU-IV Eq. Sulphur ppm max. 2500/500 500 350 50 Cetane No. * 48 48** 51** 51** Cetane Index (CI)* - 46** 46** 46** Distillation 0C 370 370 360 360 at 95% max. Polycyclic Aromatics - - 11 11 (Wt % max.) * Lower by 3 nos. for Assam Crude ** Either Cetane No. or CI
Fuel Quality Improvement - Challenges • Gasoline • Reduction of Benzene • & aromatics • - Reduction of olefins • - Reduction of sulphur • - Increase in octane • Diesel • - Sulphur reduction • - Cetane increase • - Poly-aromatic control • End point & density • reduction
Impact of MS & HSD (BS-III/Euro-IV) on Refinery operations • Space limitation in refineries for new facilities • Increase in complexity of refinery operations and safety concerns • Shrinkage in flexibility of operations w.r.t. crude mix, processing capacity, product slate.
Impact of MS & HSD (BS-III/Euro-IV) on Refinery operation • Non-availability of any one component affects product availability (viz FCCU gasoline, Reformate, Isomerate) • Impact of T-95 recovery at 360 Deg C for HSD – Disposal of Heavy ends • Increasing demand of skilled manpower for operating plants with advanced technology
Financial Impact to meet BS-II/III/Euro-IV BS-II/III Production • Investment over Rs.8,000 Crore • Increase in production cost by approx.Rs.1.00 per • litre BS-III/IV Production • Investment over Rs.15,000 Crore • Increase in production cost by approx.Rs.1.50 per • litre
Auto Fuel Policy Review MOP&NG vide O.M. No. R-29011/19/2004-OR.I dated 22nd March 2007 constituted the three member Committee: Shri M.B.Lal (Chairman, Scientific Advisory Committee) Dr.K.S.Balaraman (Executive Director, CHT) Dr.R.K.Malhotra (Executive Director, IOC-R&D) Auto Fuel Policy to be reviewed based on Air Quality and Source Apportionment studies
Status of Implementation Supply of Auto Fuels: In the initial stages of implementation in 2005, some slippage in supply of fuels Refineries working against tight schedule for meeting April 2010 norms
Status of Implementation PollutionReductionfromIn-useVehicles: PUC system up-gradation to identify polluting vehicles: yet to be done by MOSRT&H Introduction of I&Msystemforvehicles starting 2005 to 2010 in phases for reducing emissions:not in practice Old and poorly maintained vehicles are gross polluters
Status of Implementation Checking of Emission warranty for new vehicles: no system in place to verify Mandatory performance checking of catalytic converter from 2005 in 11 cities:no system developed Schemes with incentives for Retrofitting of devices on old vehicles:need to develop a programme Declaration of fuel economy: in km / litre rather than CO2 norms
Preparedness for BS-III/IV Facilities Preparation of switchover plan • Firming up of manufacturing specs for products for pipeline transfer of products • Firming-up the Pumping sequence for pipeline transfer • Pipeline Inter-phase absorption plan
Air Quality Monitoring and Source Apportionment Studies Oil Industry initiated and funded the programme MOE&F monitoring the studies in 6 six cities: Delhi, Bangalore, Mumbai, Chennai, Pune and Kanpur Interim Report received in July 2008
Air Quality Monitoring and Source Apportionment Studies Major findings: Levels of PM10 and PM2.5 high. Industries, construction activities, re-suspension of road dust are major contributor to PM in most of the cities Vehicles are major contributor to PM in Bangalore, with considerable share in Delhi, Kanpur, Pune and Chennai DG sets are major source of fine particles
Air Quality Monitoring and Source Apportionment Studies Final report is expected by December 2008 It will provide city level emission inventories, sources, and their emission loads, and Future projections for next 5-10 years.
Auto Industry Preparedness SIAM confirmed readiness for compliance with new emission regulations for vehicles from 1st April 2010. Vehicle manufacturers requested the Oil Industry to supply BS-IV fuels one year in advance for undertaking trials. BS-IV fuels can not be supplied before 2010 from domestic sources. Requirement can be met through imports.
Auto Industry Preparedness Selective Catalytic Reduction (SCR) technology for NOx reduction in BS-IV diesel vehicles need Urea to be dispensed from retail outlets along with diesel. Urea availability to the oil companies need Govt. intervention Auto industry also need to incorporate systems to check by-passing of SCR device by vehicle operators
Oil Industry Preparedness Most of the refineries will be producing both BS-III and BS-IV fuels to meet the requirements of 13 major cities Most of the refineries stated completion of the projects by March 2010 Should be possible for refineries to meet the April 2010 target of BS-IV on overall basis
Future Specifications may require MS/HSD of Sulphur less than 10 ppm in line with Global Trends
MS of Sulphur less than 10 ppm Technological Options • Hydro-treatment of Gasoline produced from FCCU, Coker, Straight Run Naphtha and Visbreaker Naphtha • Limitation- Octane loss by over 2 to 2.5 units • Hydrotreatment of FCCU feed • Alkylation -For Sulphur reduction and Octane Improvement • Augmentation of Existing treating facilities for H2S and Mercaptan
HSD of Sulphur less than 10 ppmTechnological Options • Hydrotreating for Sulphur reduction & • Cetane Improvement • Hydrocracking for HSD maximisation with • Sulphur reduction /Cetane Improvement • Installation of additional deep de-sulphurisation units for treatment of • Straight run gas oil from crude distillation unit • Vacuum gas oil from Vacuum distillation unit • Total cycle oil from FCCU • Gas oil from Cokers & • Visbreaker units
HSD of Sulphur less than 10 ppmTechnological Options • Replacement of catalyst of existing DHDTU/DHDS/HCU/OHCU by next generation catalyst to reduce sulphur in diesel streams of these units • Augmentation / revamp of various sections of existing units • De-sulphurisation units for Kerosene to meet the plug requirement of pipeline for pumping MS and HSD from refineries
MS and HSD of Sulphur < 10 ppmMagnitude of investments Considering present and future blend of Gasoline and HSD, existing and required configuration of process units of refineries, utilities, offsite and environmental requirements, Estimated investment : Over Rs 37,000 crore for IOCL refineries at current market rate of Project execution.
Issues related to Production of HSD of Sulphur less than 10 ppm Space limitation : A number of projects installed since commissioning of refineries for capacity augmentation, profitability improvement of refinery, product quality improvement and meeting other statutory norms leaving hardly any.
Issues related to Production of HSD of Sulphur less than 10 ppm • Impact of changes made in Fuel Specification made till date need to be assessed • Air Quality Monitoring and Source Apportionment Study report yet to be received Further, moving to Euro-V / 10 ppm sulfur fuel may be decided after receiving the above data