1 / 0

Broadband Product Road Map

Broadband Product Road Map. I can be found at www.btwholesale.com. 2014/15. 2013/14 H2. Migration from 20C IPstream to 21C Wholesale Broadband Connect. 20C. IPstream ‘Stop Sell’. IPstream retirement within WBC footprint & Datastream in total. WBC rollout to further sites.

damara
Download Presentation

Broadband Product Road Map

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Broadband Product Road Map I can be found at www.btwholesale.com 2014/15 2013/14 H2 Migration from 20C IPstream to 21C Wholesale Broadband Connect 20C IPstream ‘Stop Sell’ IPstream retirement within WBC footprint & Datastream in total WBC rollout to further sites Further WBC expansion (To be agreed) Ofcom Broadband Market Review Outcome Implement Ofcom Market Review Outcome Asset report: map users to network element Bandwidth demand drivers: Growth, Fibre, World cup? Commonwealth games? Wimbledon? WBMC launch metro-node handover Review of cool Broadband Voice Assured Broadband 21C TR101 Upstream line synch info delivered Value Added Services Opt out for 3db on eCo+ Broadband Enabling Technology Consume BB regenerator Implement Ofcom Consumer switching WBMC reseller model Multi-Service Edge Rollout and Migration Multi-Service Edge Further rollout BBAC speed ranges FTTC: Provide on cease Fibre on Demand early market deployment exit Wires only self install FTTC: More focused appointments G.Fast and 1Gig FTTP trials Openreach KCI notes via B2B & Portal Sim 2 for PCP only FTTC Radio to FTTC trials SIM 2 for FTTC Vectoring: post trial activities Home mover working line takeover FTTC Automatic Expedites Fibre on Demand (FoD): Price change VDSL Retransmission Fibre FOD distance based charging & full launch VDSL amplifier technical trials End of commercial rollout EMP Mitigation and Consumption BD UK areas roll out Future activities are aspirational and not fully committed Timings within years are approximate
More Related