An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey July 11, 2011

  2. USGS Stream Gage at Pacific Creek near Moran, WY Vertical Reference System Work Group Work Plan • Identify common objectives, and find opportunities for cooperative projects, tasks (near-term) • Tri-lateral agency datum standardization (NOAA/USGS/USACE) • USGS Stream gage datum updates • USACE levee datum updates

  3. Vertical Reference System Work Group Work Plan • Identify Products and Services within each agency impacted by new vertical datums (near-term) • Develop strategy to address changes that will be required to P&S (near- to mid-term) • Develop pilot projects to address agency needs (near- to mid-term) • Update existing guidelines, standards, specifications to support transition to new datums (long-term)

  4. Vertical Reference System Work Group Work Plan • Education, Outreach, Capacity Building for users (ongoing) • Brief FGCS on accomplishments (ongoing) • Identify POCs in agencies to join workgroup, perform tasks (ongoing)

  5. VRSWG Accomplishments: May 2010-Present • Teleconferences now held quarterly • next meeting October 6, 2011 • Attendance by NGA, USGS, USACE, NPS, FCC, FEMA • Meeting notes posted on FGCS web site • Developed worksheet for each agency to identify their products/services that rely on vertical datums

  6. Agency Tracking Plan – DHS/FEMA

  7. Agency Tracking Plan – USACE

  8. Height Modernization Program Accomplishments: May 2010-Present • Monthly teleconferences to inform users – value-added with guest speakers • Education and outreach activities • Support projects designed to enhance vertical component of NSRS, present and future • NC/FEMA Floodplain mapping pilot – see Poster session • TX Geoid Slope project • Surveys: So. LA, IGLD, MS and others

  9. Height Modernization Program Accomplishments: May 2010-Present • Discuss transition strategies with new datum project managers • Support for GRAV-D and geoid model updates • Develop National Height Modernization Plan (NHMP) • Internal Draft by end of FY2012 • Tie to NGS 10-year plan; incl. strategic plan and short-term operating plan • Emphasize coordination with federal partners • Include budget requirements/strategy

  10. Align NHMP with NGS Business Plan model • Infrastructure • Gap analysis • Modernize NGS geodetic control datasheets • Guidelines, Models, Tools • Geoid12 • H- AND VTDP • OPUS: e.g. OPUS Projects workshop, July 11-12, San Diego • Update HM Guidelines, NGS58 and 59

  11. Align NHMP with NGS Business Plan model • Education, Capacity Building • Update height modernization web site • Lidar workshop – August 18, 2011, Silver Spring, MD • 2ND Federal Geospatial Summit, July 2012, San Diego, CA

  12. Questions Fast is fine, but accuracy is everything. – Wyatt Earp A witty saying proves nothing. - Voltaire Renee Shields Height Modernization Manager 301-713-3231, x116 Renee.Shields@noaa.gov http://www.ngs.noaa.gov/heightmod/EventsArchive.shtml