1 / 6

Product Lifecycle of an IDE

Product Lifecycle of an IDE. Design Controls 21 CFR 820.30. Design and Development Planning Design Input Design Output Design Review. Design Verification Design Validation Design Changes Design History File. Design Control Subsystem. Design Controls Purpose.

kayo
Download Presentation

Product Lifecycle of an IDE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Product Lifecycle of an IDE Design Controls 21 CFR 820.30

  2. Design and Development Planning Design Input Design Output Design Review Design Verification Design Validation Design Changes Design History File Design Control Subsystem

  3. Design ControlsPurpose • Control the design process to assure that devices meet: • User needs • Intended use • Specified requirements

  4. Benefits of Design Control • Produce higher quality devices by focusing on designing in quality. • Recognize problems earlier and make corrections. • Enhance degree of conformance of design to the user and patient needs.

  5. Applicability • Design controls: • Are not intended to apply to concept and feasibility studies • Apply to devices under Investigational Device Exemption (IDE) • Are not retroactive to devices already in distribution prior to June 1, 1997

  6. Questions? • Please contact Michelle Noonan-Smith at michelle.noonan-smith@fda.hhs.gov if you have any questions.

More Related