1 / 10

JINR plan for FCAL R&D

This report provides an overview of the current activities at JINR, including MC simulation for FCAL optimization, hardware activities such as the study of diamond and Si sensor options, and infrastructure development. It also covers plans for future activities and open questions regarding FEE+DAQ electronics, R&D plans, irradiation tests, and financial sources.

kconnelly
Download Presentation

JINR plan for FCAL R&D

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JINR plan for FCAL R&D JINR DLNP group status report and plans (Z. Krumstein, G. Shelkov)

  2. Current JINR activities: • MC simulation for FCAL optimisation • Hardware activities: a) - Diamond sensor (CVD) option study continuation of R&D in cooperation with GPI (Moscow) b) - Si sensor option study c) - Infrastructure development

  3. MC simulation for FCAL optimisation Low BG ( ~ 0°) High BG ( ~ 90°) 5mm 8mm 10mm 5mm 8mm 10mm

  4. MC simulation for FCAL optimisation Inefficiency to identify 200 GeV electrons (R<55mm) High BG ( ~ 90°) Low BG ( ~ 0°)

  5. Diamond sensor (CVD) option study • Two new type of CVD foils (500µ and 200µ thickness ) was produced at GPI. • At the end of September several samples (8x8)mm2 should be delivered to Dubna after control measurement at GPI and metallization at Frjazino. • After test of electrical characteristics and measurement with -sourcethe samples ( in case of positive results) will be sent to Zeuthen for further investigations. • There is plan to construct in GPI a new setup for CVD foils growing for detector R&D at the end of this year.

  6. Si sensor option study at JINR The plan is to study a possibility of production Si sensors for FCAL in Russia: 1. Si sensor sector production at ELMA firm (Zelenograd, Moscow reg.) on the base of wafer from firm “Siltronic Wacker” (Germany). ELMA has a good experience for Si sensor production for the ECAL preshower of CMS project at LHC and now for PHENIX forward calorimeter upgrade(RHIC,BNL) together with MSU group. The max waffer diameter now is 4”. There is a plan to start 6” wafer production at ELMA. 2. Incoming tests, cutting, contact wires welding, outcoming tests, performance study with -source in DLNP JINR (JINR has a good experience for Si sensor test and final assembling for CMS project) 3. Study a possibility of radiation test of samples at JINR microtone (EeMax = 25 MeV) (test set up must be constructed) 4. Study a possibility of tungsten plate production in Russian industry.

  7. Infrastructure development • The plan is to adopt existing large area clean room* (6x18)m2 for Si sensors production and testing. • First two devices: - ultrasonic bonding (welding?) machine, - stand for electrical characteristics of Si measurements was bought delivered and installed at clean room (see photo). * - this clean room was constructed at DLNP for of ATLAS muon drift tube detectors assembling and will be available from the end of October

  8. Infrastructure

  9. Infrastructure

  10. Open questions • FEE + DAQ electronics for Si sensors? • Elaboration of Dubna group R&D plans (for example: test setup for sensor study with radioactive sources • Irradiation tests at the microtron. • Financial sources?

More Related