1 / 5

APEX Report May 12-13, 2009 May 20, 2009

APEX Report May 12-13, 2009 May 20, 2009. Fulvia Pilat Time Meeting, May 26 2009. APEX Schedule May 20 2009. Ramp pp94- nearInt No beam. Ramp Pp93 No beam. Ramp Pp93 12 bunches. Store pp93 12 bunches. Store pp93 12 bunches. Store pp93 12 bunches BBQ. Ramp Pp100

keelty
Download Presentation

APEX Report May 12-13, 2009 May 20, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APEX ReportMay 12-13, 2009May 20, 2009 Fulvia Pilat Time Meeting, May 26 2009

  2. APEX Schedule May 20 2009 Ramp pp94- nearInt No beam Ramp Pp93 No beam Ramp Pp93 12 bunches Store pp93 12 bunches Store pp93 12 bunches Store pp93 12 bunches BBQ Ramp Pp100 operations Re-commission pp93 250 GeV Ptitsyn Marr + operations Test pp94- nearInt (datastores) Bruno Tepikian Load pp93 (250 GeV) and RampManager Schultheiss Bruno Tepikian Controls 09-06 Off-momentum beta-beat Calaga, Glenn 08-27 Optics measurements Bai Beta* measurement Ptitsyn BACK 2 PHYSICS 7am 8am 10am 12:30pm 2:00pm 4:00pm 6pm 7pm

  3. Ptitsyn, +operations Re-commissioning of 250 GeV ramp Successful/quick re-commissioning effort Orbit and store readjustment Off momentum beta-beat study done Failures followed…

  4. APEX Schedule May 26-27 2009 Store 28 bunches BBQ Store 36 bunches Store 12-36 bunches Injection Injection No beam 09-07 Impedance Calaga Operations Non-linear chromaticity Demolaize Luo +Operations 08-08 Long Range beam-beam Fischer Demolaize +team 09-05 D0-DX study MacKay Satogata 08-27 Linear optics corrections Wang Test of pp94nearInt ramp Bruno 08-29, 08-10 Polarimeter study Huang, Zelenski RHIC Instrumentation Minty 7pm 9pm 11pm 1am 3am 5am 7am 8am End APEX

  5. Overall Plan for 100 GeV run