50 likes | 174 Views
APEX Report May 12-13, 2009 May 20, 2009. Fulvia Pilat Time Meeting, May 26 2009. APEX Schedule May 20 2009. Ramp pp94- nearInt No beam. Ramp Pp93 No beam. Ramp Pp93 12 bunches. Store pp93 12 bunches. Store pp93 12 bunches. Store pp93 12 bunches BBQ. Ramp Pp100
E N D
APEX ReportMay 12-13, 2009May 20, 2009 Fulvia Pilat Time Meeting, May 26 2009
APEX Schedule May 20 2009 Ramp pp94- nearInt No beam Ramp Pp93 No beam Ramp Pp93 12 bunches Store pp93 12 bunches Store pp93 12 bunches Store pp93 12 bunches BBQ Ramp Pp100 operations Re-commission pp93 250 GeV Ptitsyn Marr + operations Test pp94- nearInt (datastores) Bruno Tepikian Load pp93 (250 GeV) and RampManager Schultheiss Bruno Tepikian Controls 09-06 Off-momentum beta-beat Calaga, Glenn 08-27 Optics measurements Bai Beta* measurement Ptitsyn BACK 2 PHYSICS 7am 8am 10am 12:30pm 2:00pm 4:00pm 6pm 7pm
Ptitsyn, +operations Re-commissioning of 250 GeV ramp Successful/quick re-commissioning effort Orbit and store readjustment Off momentum beta-beat study done Failures followed…
APEX Schedule May 26-27 2009 Store 28 bunches BBQ Store 36 bunches Store 12-36 bunches Injection Injection No beam 09-07 Impedance Calaga Operations Non-linear chromaticity Demolaize Luo +Operations 08-08 Long Range beam-beam Fischer Demolaize +team 09-05 D0-DX study MacKay Satogata 08-27 Linear optics corrections Wang Test of pp94nearInt ramp Bruno 08-29, 08-10 Polarimeter study Huang, Zelenski RHIC Instrumentation Minty 7pm 9pm 11pm 1am 3am 5am 7am 8am End APEX