1 / 9

DEVELOPING A NEW LOCAL TRANSPORT STRATEGY: ISSUES FOR REVIEW

DEVELOPING A NEW LOCAL TRANSPORT STRATEGY: ISSUES FOR REVIEW. Almond Neighbourhood Partnership. The LTS process. Current Local Transport Strategy 2007 – 2012 now extended to end 2013, but in need of replacement. Aim to have new LTS in place by end 2013. Two stage consultation:

keiji
Download Presentation

DEVELOPING A NEW LOCAL TRANSPORT STRATEGY: ISSUES FOR REVIEW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DEVELOPING A NEW LOCAL TRANSPORT STRATEGY: ISSUES FOR REVIEW Almond Neighbourhood Partnership.

  2. The LTS process • Current Local Transport Strategy 2007 – 2012 now extended to end 2013, but in need of replacement. • Aim to have new LTS in place by end 2013. • Two stage consultation: • 4 February to 17 March 2013, on Issues for Review. • Early autumn, on new draft LTS. Almond Neighbourhood Partnership.

  3. Local Transport Strategy Almond Neighbourhood Partnership.

  4. Issues covered by the Report. • Integrated Transport. • Supported Bus Services. • Speed Limits – 20mph. • Speed Limits – 30mph. • School Streets. • City Centre Parking. • Sunday Parking. • Residents Parking/Controlled Parking Zone (CPZ). • Air Quality. • Travel Planning. Issues not covered by the Report. • Current Action Plans and areas of settled policy. • Issues being dealt with by other processes. Almond Neighbourhood Partnership.

  5. Issues in which there is no planned change in policy direction. • Street Design and Strategic Transport Network Management. • Active Travel. • Road Safety. • Longer Distance Connectivity. • Park and Ride. • Transport and Planning policy integration. • Edinburgh Tram. Almond Neighbourhood Partnership.

  6. Areas of change being dealt with through other processes. • Maintenance and Renewals. • The City Centre. • Community and Accessible Transport • Forth Replacement Crossing Public Transport Strategy. Almond Neighbourhood Partnership.

  7. Consultation Process. • Social media will be used to encourage responses. Almond Neighbourhood Partnership.

  8. 2. Supported Bus Services • Option 1 Increase funding to maintain, and where possible enhance, current service levels. • Option 2 Safeguard current level of spend in real terms. Almond Neighbourhood Partnership.

  9. Thank you for listening Almond Neighbourhood Partnership.

More Related