Sequence of Events Recording for Kardia Power Station Greece Ian Loudon Omniflex International Marketing and Sales
Omniflex • Omniflex South African Manufacturer of Industrial Electronic Products • Founded 1965 as Conlog became Omniflex 1996 • 50% of Turnover exported • Sales Office JHB, UK, Australia Head Office Durban • Wonderware and Sequence of Events recording since 1988 ESKOM, Sasol, Natref
Introduction This Project improves an ageing Coal Fired Power Station Root Cause Analysis by 90% Kardia Power Station Greece
Introduction Project Solution Agenda Benefits Considerations Summary
Kardia Power Station Greece Up to 50% of Greece’s Electricity from Coal (Lignite) 6 Lignite Fired Stations Agios DimitriosAmyntaioFlorinaKardiaMegalopolisPtolemais How much coal is required to run a 100-watt light bulb 24 hours a day for a year?
Background to the Project Location : GreeceOperator : Public Power CorpConfiguration : 4 X 300 MWOperation : Since 1975 ……Fuel : LigniteBoiler : Stein, Ganz-RockT/G supplier : Alstom, LMZ, TeploenergoEPC: Zarubezhenergoproekt T/G Turbine Generator EPC Engineering Procurement Construction
Business Objective • Plant Optimization • Reduce Downtime • Effective Alarm Localization • Nuisance Alarm Identification • High Availability • Cost effective Solution
Operational Objectives • Root Cause Analysis • Alarm History • Local Alarm Indication • Fast and Reliable Event Capture • Redundancy of I/O Processors
Introduction Project Solution Agenda Benefits Considerations Summary
Selection of Solution • Local SI for Local Support • Wonderware SCADA selected for • Ease of configuration • Minimal effort to integrate Date and Time Stamp at source event streams through OPC server
System Implementation • 960 Relay Contact Inputs COS monitoring • 960 Alarm Statuses Annunciated • Input discrimination to 200μseconds • Minimum Pulse Width 500μseconds • Time Stamping Accuracy 200μseconds
Time Synchronization • GPS Station Time • OPC server Service
Controller Redundancy • Dual Controller • Includes Queue Services
Topology SCADA Primary OPC Marshalling Panel Conet Field Inputs Ethernet Secondary Modbus CAN
Disadvantages of Poll Response Disadvantages of a poll/response network · Poll/Response uses %100 of available bandwidth. · The data "Transport" is the "Application". You can't break them apart. · One protocol for all field equipment limits deployment of new technology & impedes migration to new topologies. · It is not a "managed" network. · One-to-One data relationship between the Host and field equipment Master Slave
Producer Consumer Subscription Consumer Application 1 Middleware Message Broker Eg Queue Service Producer eg SOE System Consumer Application 2 Publish Subscribe Subscribe Consumer Application 3 • Advantages: • Network Traffic Minimized • Efficient use of Network Bandwidth • Multiple consumers
System Implementation • In House Engineering and Testing and Configuration, SCADA, OPC, Maxiflex 1 week • Local Panel Alarm Annunciators via Modbus RS485 • Wonderware SCADA Final Configuration On Site • Copy Paste for Second System 2 Days In House Engineering and Testing
Introduction Project Solution Agenda Benefits Considerations Summary
Benefits / Goals Achieved • Plant Optimization • Reduce Downtime • Effective Alarm Localization • Nuisance Alarm Identification • High Availability
Benefits / Goals Achieved • Root Cause Analysis • Alarm History • Local Alarm Indication • Fast and Reliable Event Capture • Redundancy of I/O Processors
Realised Benefits • 90% improvement in Root cause analysis • 25% improvement in Generating Availability • 40 to 50% time saving in Maintenance • Huge Saving on Hard Wired Annunciation • Project Implementation Short • End User Empowerment on system usage, migration and on going improvement • Rapid Deployment of next Generator system
Introduction Project Solution Agenda Benefits Considerations Summary
Lessons Learned • Learn to Speak Greek ! Real Greek • Partnering with local Wonderware SI’s essential • Preconfigured Wonderware for Front end Hardware from Factory simplifies field work
Introduction Project Solution Agenda Benefits Considerations Summary
Conclusions • Wonderware was a good choice for seamless integration of Date and Time stamped events into an HMI for management of Alarm and Events. • Wonderware Presence worldwide presented this opportunity for us from a South African and UK Base.
Project summary • “The system works well and enables incidents to be tracked very efficiently”.Ilias Kalaitzis ,Project Engineer, Control Systems
Project Summary • Project Delivered in 2008 on time during Shut Down of Generator Unit Period 16 Weeks Entirety • Second Unit simple Copy and Paste for SOE Configuration. Completed Dec 2008 • We are expecting orders for the balance of 2 Generator Sets
Questions ? Solutions by Design