Export Controlled Information. Target and Countermeasure Programs. January 31, 2008. DO 20 CLIN 0001 – FTA-04B System Requirements Review. NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on WGC or EPDM.
E N D
Export Controlled Information Target and Countermeasure Programs January 31, 2008 DO 20 CLIN 0001 – FTA-04B System Requirements Review NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on WGC or EPDM. HQ0006-04-D-0006 For Official Use Only
Ent 9 Delivery Order 20 FTA-04BPropellant Transfer Segment/OperationsTim McDerby Target and Countermeasure Programs (256) 722-4314tim.a.mcderby@lmco.com
Agenda • CONOPS • Propellant transfer segment tree • Propellant transfer system heritage • Propellant transfer hardware risk mitigation • Issues and concerns • Summary/ Way Forward
RTTC Operations LMSSC HSV Operations Concord/Pt. Magu Operations FTA-04B CONOPS Ent 9 RTTC 4BW (Start Ship PTS to Exit 7 Operations Fuel) Loading Concord LMSSC System Acceptance Test of FTA-04B Packout of FTA-04B Horizontal/ Vertical Testing ISP Bench HSV Testing Operations System Acceptance Test of FTA-04B Bay Val Receive Ground Transport Concord Launch Control Hardware from from HSV to Concord Operations System LMSSC Ordnance Installation Fueling Fit-To-Ship FTA-04B Mission L-3 Rehearsal Operations Review Launch Operations Post Launch Return to High Pressure Fill Start Fuel Setup Safing Concord GSE Mission Retrograde Close FTA-04B Refurbishment
Propellant Transfer Segment Tree Propellant Transfer Segment (GFE) Start Fuel Transfer Subsystem Main Propellant Transfer Subsystem Test Equipment • Start Fuel Container • FDA • Valve Position Monitor • Valves • Regulators • Start Fuel Test Box • Target Missile Simulator • Access Stand • Main FuelTransferSystem • OxidizerTransferSystem GFE Propellant Transfer System Proven on Delivery Order 7
Propellant Transfer Segment Heritage • Main Propellant Transfer System • Built by LMMS under CTTS Task Order 14 • Refurbished by LMMS and used on CTTS Task Order 26 • Refurbished by LMMS under TCP Delivery Order 7 • Start Fuel Transfer Subsystem • Built by LMMS under CTTS Task Order 12 • Refurbished by LMMS under CTTS Task Order 14 • Refurbished by LMMS under CTTS Task Order 26 • Refurbished by LMMS under TCP Delivery Order 7 • Test Equipment – Remote Pressurization System • Designed and built by LMMS under CTTS Task Order 25 • Utilized during TCP Delivery Order 7
Propellant Transfer Hardware Risk Mitigation • Propellant Transfer System Hardware • Utilize the same propellant transfer equipment and procedures used on CTTS Task Order 26 • Propellant Transfer System will be refurbished at the conclusion of the FTS-03 mission for FTA-04B • An additional Remote Pressurization Panel will be built under this DO for Huntsville testing. This mitigates related schedule risks.
Summary/Path Forward • Complete booster leak check testing • Oxidizer tank leak check • Main Fuel tank leak check • Booster checkouts • Horizontal and vertical testing • High pressure leak tests • Oxidizer/Main Fuel tank swipe tests • Perform periodic GSE maintenance • GSE maintenance on the MLP • GSE maintenance in Huntsville • CONOPS • Develop final CONOPS plan • Support final UDS development
Delivery Order 20 FTA-04BSafetySandy Roman Target and Countermeasure Programs (256) 217-6345sandy.roman@lmco.com
Agenda • Flight Safety • Ground Safety • Way Forward
Flight Safety • Utilize T/O 26 tailoring of the Pt. Mugu, NAVAIR WD Flight Safety Data Requirements • Submit Range Safety Data Package (RSDP): • General missile description • Trajectory information • Flight HA methodology • Simulation parameters • Telemetry requirements • Receive and incorporate range comments or acceptance of the tailored requirements
Ground Safety • Utilize T/O 26 tailoring of safety requirements (i.e. NAVAIR, MIL-Std 882, EWR 127-1 etc.) as the format for the ground safety data package (GSDP) to be delivered • Address specific safety issues: • HE and/or front-end handling/storage • Ordnance storage/handling/installation • Propellant storage/handling/transfer
Way Forward • Flight Safety • Submit draft RSDP • Specific flight safety information will be transmitted to the range (i.e. trajectory info, FTS specifications, etc.) • Flight safety working groups as required/needed • Bi-Weekly telecoms (FSWG & FTS/GPS) • Ground Safety • Submit draft GSDP • Specific safety issues will be addressed • Ground safety working groups as required/needed • Bi-Weekly telecoms (GSWG)
Ent 4 Exit 4 Delivery Order 20 FTA-04BRiskJeff Hampton Target and Countermeasure Programs (256) 217-6145jeffrey.r.hampton@lmco.com
FTA-04B Risk Items Ent 4 1. Risk Title: S-Band Frequency Overlap Description: If the TCP target frequencies are placed in upper S-band, then TCP must procure new design antennas. Mitigation Plan: Determine FTA-04B target frequencies. Gain final approval of target frequencies. If required, design new antennas. Procure antennas. Status: Currently coordinating frequencies with the Arrow Project Office and Coleman. ECD: March 31, 2008 Exit 4 Exit 8 Risk Exposure Low
Delivery Order 20 FTA-04BClosing and Action Item ReviewBarry Bryant Target and Countermeasure Programs (256) 217-6576barry.bryant@lmco.com
Action Item Review Exit 1 Exit 5 Exit 6