R9 Preparations Summary. Roy Preece 15 th August 2012. Progress. FC outrigger frame test assembly Scaffolding to access FC assembled, more parts required Cable tray for FC services being installed Compressor cooling water manifold being looked into.
E N D
R9 Preparations Summary Roy Preece 15th August 2012
Progress • FC outrigger frame test assembly • Scaffolding to access FC assembled, more parts required • Cable tray for FC services being installed • Compressor cooling water manifold being looked into. • MICE-Net operational in the R9 hall – hardwired connection • Storage cages have been assembled – delicate items have been stored in the smaller of the two. • Racking will be installed into the larger cage • Water chiller will be positioned outside – approval being sought – location drawing be produced. • Power supply and control rack will arrive next week • Investigate getting the compressors into the hall • Work benches are in R9, desks will be sought and put onto the East wall. Ethernet cables will be routed to the desk positions. • A web site will be setup to give information - http://micewww.pp.rl.ac.uk/projects/r9-hall-operations