1 / 5

Status of LVL2 e/  ESD/AOD

Status of LVL2 e/  ESD/AOD. Monika Wielers Etham-Etienne W ö hrling Ricardo Gonçalo Objectives Level 1 Tracking Calorimeter. Persistification of trigger info at ESD. Information currently available in the CBNT and used by the e/  analysis framework

kelli
Download Presentation

Status of LVL2 e/  ESD/AOD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of LVL2 e/ ESD/AOD Monika Wielers Etham-Etienne Wöhrling Ricardo Gonçalo Objectives Level 1 Tracking Calorimeter

  2. Persistification of trigger info at ESD • Information currently available in the CBNT and used by the e/ analysis framework • ESD level: need to store LVL2 clusters and tracks and LVL1 RoI information • CBNT: would be very good to use e/ framework without major changes  need some of the code to fill CBNT from ESD • AOD level: minimal info about trigger menus satisfied (very useful for physics analysis)  worry about this after ESD and CBNT are done • Previous talks: PESA-Algo meetings Dec 7; Jan 27 PESA Algorithms - ATLAS SW Workshop

  3. Level 1 • RoIBuilder results already available (Tadashi) • But not enough information (isolation, energy…) • Easiest solution was to persistify trigger towers so that results can be re-calculated • zero suppressed, so no size problems • Also need to re-calculate LVL1 quantities from trigger towers to fill CBNT PESA Algorithms - ATLAS SW Workshop

  4. Tracking • TrigInDetTracks converted to TrackParticle • Code is in today’s nightly (Default TrackParticleContainer name is “TrigTrackParticleCandidate”) • Tested against atlrel_4; some unrelated problems in atlrel_1, will test asap (more testing time would be nice) • New package TrigTrackParticleCreator depends on TrigToTrkTrackTool and TrkParticleCreator • Code under development to write tracking info in CBNT tracking block in same format as before (hope to be there for thursday) PESA Algorithms - ATLAS SW Workshop

  5. Preparation for Rome • Status of persistification • EMShowerMinimal persistification available and commited into cvs • TrackParticle code running (in today’s nightly) • LVL1: work ongoing by Ethan and Alan. Now on critical path • Attempts to persistify TT’s under way, but so far not successful (Ethan) – Help would be welcome • We hope to be ready for Thursday’s nightly… • Need new CBNT which re-calculated LVL1 info from TT’s (Alan) • commit jobOptions to TriggerRelease to create CBNT from ESD’s (Monika) • Not yet done, will be done on thursday • Plans for testing • Tests will be done on 25GeV Rome initial layout single electrons once rel. 10 or pre-10 is out to test complete machinery PESA Algorithms - ATLAS SW Workshop

More Related