1 / 21

August 17, 2012

August 17, 2012. Energy Huntsville Forum. 1. CAPTIN 1985. TMMC 2 2008. TMMC 1988. SIA 2007. TEMA 1996. TMMWV 1998. TMMI 1999. BODINE 1990. TABC 1971. TMMK 1988. BODINE 2005. TMMAL 2003. TMMBC 2004. TMMMS 2011. TMMTX 2006. $21+ Billion Invested 40,000 Direct Employees.

kelsie-ball
Download Presentation

August 17, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. August 17, 2012 Energy Huntsville Forum 1

  2. CAPTIN 1985 TMMC 2 2008 TMMC 1988 SIA 2007 TEMA 1996 TMMWV 1998 TMMI 1999 BODINE 1990 TABC 1971 TMMK 1988 BODINE 2005 TMMAL 2003 TMMBC 2004 TMMMS 2011 TMMTX 2006 $21+ Billion Invested 40,000 Direct Employees Toyota Manufacturing in North America Vehicle Plants - 7 Unit Plants - 5 Engine Plants - 2 Regional HQ 2

  3. TMMAL Overview – Company Profile Foundation: June 1, 2001 Investment: $700 million (by Spring 2014) Location: Huntsville, AL Toyota Property Line NEW 3.5L V-6 Plant Size: Land 200 acres Building 1.08 million sq ft 5.7L & 4.6L V-8 Employees: 1,150 (by Spring 2014) 4-Cyl 4.0L V-6 3

  4. What Makes Toyota Different? • Empower Team Members • What Gets Measured Gets Done • Never Stop Improving 4

  5. TMMAL Environmental Team What is the Environmental Team? • Provides support, guidance and standardization • Team Member-driven Environmental system/program • Follows annual calendar for activities, training and audits Who is on the Environmental Team? • Voluntary position • 2 per Group House – 1 per shift • Serve at least one year, many serve longer if trained as Internal Environmental Auditor 5

  6. Regular Environmental Activities 6

  7. Daily Process Checks • Production Team Members check their process daily at start and end of shift • Report any issues or concerns for compliance or risk • Enables management, Environmental Team Members to quickly address issues and implement countermeasures Right: Mist Collector Machining Process Below: Daily Checksheet 7

  8. Kamishibai Checks • Use card system and board for audit tracking • Environmental Team completes weekly audit on all items in daily checks • Managing your process • Compliance and risk • Knowledge retention • Ensures production Team Members are completing daily checks accurately 8

  9. Team & Management Meetings • Monthly Team meeting to: • Share targets and results • Communicate new requirements • Highlight special events • Provide monthly status update to upper management, address any specific issues raised in Monthly Team Meeting 9

  10. Semiannual Environmental Audits • Specially-trained group of auditors within Environmental Team • Conduct semiannual audits to confirm system health. Look for: • Compliance and risk management • Training records and document control • Face-to-face interviews with randomly selected team members on environmental awareness topics • Auditors responsible for multiple areas in plant, but can’t audit own area 10

  11. Semiannual Kaizen Blitz KAIZEN– Continuous Small Improvement BLITZ– Hitting it from all directions in a concentrated effort! • Cross functional team focuses on improvements in specific environmental impact areas: • Energy • Water • Waste • Special Projects 11

  12. Semiannual Kaizen Blitz • Corporate offices provide target reduction percentage, TMMAL calculates identified savings for next year • Potential kaizens placed on following FY’s Environmental Management Plan • TMMAL currently working on items identified in FY12 12

  13. Semiannual Kaizen Blitz 13

  14. Semiannual Kaizen Blitz • Compressed Air Actuators13 valves not being • used in production areas • 63 hours/week • Estimated Annual Savings: • 283,500 kwh/year • $19,845 / year 14

  15. Semiannual Kaizen Blitz • Outdoor Lighting • Switch outside HPS lighting to UCD Lighting • Reduces energy usage by 70% • Total of 100 pole lights Old Cost = $23,993 Savings = $8,656 / yr Payback = 2.75 yrs Energy Reduction = 123,662 kwh/yr New 15

  16. Semiannual Kaizen Blitz 16

  17. Semiannual Kaizen Blitz • History • Average Summer monthly usage = 1,000,000 gallons • Average waste = 150,000 gallons 6/7 cycles • Projected • 70% of lost water will be saved with filter • 105,000 gallons will be put back in system 1/7 cycles Nano Filter 17

  18. Semiannual Kaizen Blitz 18

  19. Semiannual Kaizen Blitz • Covanta Go-and-See • Environmental Team Members visited Covanta site • Potential Items to be recycled: • Cardboard • Plastic • Paper • Parts • Dunnage • Target 50% of load diverted to recycle stream Driver left debris when leaving compactor 19

  20. Summary • Empower Your Team Members • What Gets Measured Gets Done • Never Stop Improving 20

  21. Any questions? 21

More Related