Best Value Public Works Procurement September 7, 2007. Existing Alternatives. Design – Bid – Build General Contractor / Construction Manager (GC/CM) Design – Build Job Order Contracting. Room for Improvement?. JLARC Recommendations (2005) Finding 1:
E N D
Best Value Public Works Procurement September 7, 2007
Existing Alternatives • Design – Bid – Build • General Contractor / Construction Manager (GC/CM) • Design – Build • Job Order Contracting
Room for Improvement? • JLARC Recommendations (2005) • Finding 1: • Some agencies may be using GC/CM to overcome deficiencies in the Design-Bid-Build contracting method. • Recommendation 1: • The Legislature, through the CPARB, should further analyze the implications of the low-bid requirement on capital construction projects.
Similar Trends Nationally • Federal Executive Order (1994) establishing Best Value Procurement • “Place more emphasis on past contractor performance, and promote best value rather than simply low cost in selecting sources for supplies and services.”
Similar Trends Nationally • Who is using Best Value Procurement? • Federal Government • Several States • Massachusetts • California • Florida • Texas • Minnesota • And others • Universities • Private Companies
What is a “Best Value Procurement?” • Seeking Value • Seeks to choose the provider offering the best combination of performance, qualifications, and price. • Honoring the Public Trust • Construction procurement should be consistent, open, competitive, and free of political influence.
Best Value Procurement III. Negotiated-Bid II. Value Based Best Value (selection based on qualifications, past performance, and price) Less dependent on detailed drawings and specs Private Sector Process Owner selects vendor Negotiates with vendor Vendor performs Contractor minimizes risk Performance I.Price Based IV. Unstable Market Dependent on detailed drawings, specifications and standards Requires high level of Management & Inspection Owner minimizes risk Price Competition
Modifies Design–Bid–Build Model Designer Public Entity Change in Selection Process Here General Contractor Sub-contractors
The BV Selection Process • Establish a selection committee • Issue a RFQ announcement • Evaluate qualification submittals • Establish a short-list • Check references • Conduct technical reviews • Conduct interviews • Receive Bids
The BV Selection Process • Two general approaches: • Trade-Off Analysis (more subjective) • Formulaic Approach (more objective) • Non-Price factors: • The RFQ submittal • Reference checks • Third party technical review • The short-list interview
Relative Importance of Price • Three Categories • Price is LESS important than the technical criteria • Price is EQUAL in importance to the technical criteria • Price is MOREimportant than the technical criteria
Desired Results • Better achieve project goals • Budget • Schedule • Quality • Lower the risk of construction claims • Increase management efficiency