2. Purpose. Integrate Foundation-Based Operations (FBO) activities to enable GEOINTFoundation-based Operations (FBO)
E N D
1. Foundation-Based Operations Management Authority Army Geospatial Conference4 May 2005
2. 2 Purpose Integrate Foundation-Based Operations (FBO) activities to enable GEOINT
Foundation-based Operations (FBO)
“The standards, processes, and resources for producing and managing integrated global GEOINT to meet customer specific needs. FBO includes the ability to populate and maintain content with surge capability and capacity.”
GEOINT
“The exploitation and analysis of imagery and geospatial information to describe, assess, and visually depict physical features and geographically referenced activities on the Earth”
Fusion of geospatial information, imagery, and imagery intelligence
3. 3 Background Geospatial Transition Plan
Geospatial information layers in the GKB
Readiness & Responsiveness Strategy
NGA not currently meeting commitments for production of geospatial data and information
NSG Operational Requirements Document
Key Performance Parameters 6 & 7
NGA and the birth of GEOINT
Geospatial intelligence Assessment Activity
Geospatial Data Summit
Recommendation to Director…stand up a Management Authority
4. 4 Background (cont.) Management Authorities
Chartered by Director
Managed by the Office of Geospatial-Intelligence Functional Management
Limited duration: six to 12 months
Address a specific theme or problem set
Focus on particularly intractable issues
Advanced Geospatial Intelligence
Airborne Integration
Commercial Remote Sensing
Delivers a Strategic Implementation Plan (SIP)
Defines responsibilities, levies accountability
5. 5 FOMA Methodology Develop Terms of Reference
Defines the scope of the effort
Determine the “As-Is” Baseline
Documents current FBO activities – where we are today
Develop “To-Be” Vision
Integrates the GEOINT information environment
Action Matrix
Portrays the “deltas” between where we are (“as-is”) and where we want to go (“to-be”)
Strategic Implementation Plan
The way ahead…an actionable investment plan
Monitor and measure progress on SIP
6. 6 Key Elements for FOMA’s Success Strengthened GEOINT requirements process
Information-based vice product
More immediate feedback and status
Production planning and management
Leverage customer and partner interaction: Unified GEOINT Operations
Incorporation of value-added data into GKB
Needed for future, high-fidelity data and analysis
Can’t get there from here without it
Can’t afford not to
Technology
Requirements and Production management and planning
Conflation, data management, feature generalization
Mechanism for accountability and performance measurement
Standards
Symbology, specifications, view generation, mission applications
7. 7 Data Content Specification provides guidance – currently in development.
Must have an integrated method for identification and tracking of mission needs & requirements.
Multiple data sources will populate the database
Integrated information environment – we need a common set of definitions for content.Data Content Specification provides guidance – currently in development.
Must have an integrated method for identification and tracking of mission needs & requirements.
Multiple data sources will populate the database
Integrated information environment – we need a common set of definitions for content.
8. 8 Integrated Schedule – GSMA/FOMA