1 / 11

Geometry Monitoring System

Geometry Monitoring System. Present status (TDR) and difficulties The RELCAM sensor (TDR) The RASNIK alternative A realistic RASNIK segment Equations to be solved Ongoing work Project plan. Present difficulties. In TDR, the set-up of laser lines is:

kendra
Download Presentation

Geometry Monitoring System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Geometry Monitoring System • Present status (TDR) and difficulties • The RELCAM sensor (TDR) • The RASNIK alternative • A realistic RASNIK segment • Equations to be solved • Ongoing work • Project plan gms, jyg, mont dore 2002

  2. Present difficulties • In TDR, the set-up of laser lines is: • 4 lines in two vertical planes and one step • 4 lines in 45o planes in azimuth and two steps • Problems of this set-up are: • No projectivity • Two supports to be monitored … induce lost of precision • Effect of temperature gradient expected important in this case of long light lines … question about realistic shielding gms, jyg, mont dore 2002

  3. The RELCAM sensor • In TDR, was presented the RELCAM sensor: • Semi-reflecting mirror • CMOS camera (628 x 582 pixels) • Test on bench • Laser (785 nm), Granit table (2.5 x 0.5 m2) • Motorized stage (x, y) … ±0.5 μm • Results: • Resolution: σx = σy = 0.5 μm • Stability: Δx, Δy < 0.8 μm per oC • Linearity: < 1 μm within 2 x 2 cm2 • Problem: a 2 dimension sensor in the transverse directions (x, y) • z direction not monitored gms, jyg, mont dore 2002

  4. One step laser lines • We cannot adopt such a set-up • Due to the constraints imposed by the coil • More than 24 slats of the stations 3, 4, 5 would be on the path of the lines • No realistic change in their design is possible … without triggering a crisis with Manoel and others • Need of new system for monitoring gms, jyg, mont dore 2002

  5. Alternative proposal • Based on the RASNIK sensor • Each element is set on a chamber frame/support to be monitored • Resolution: σx = σy = 1 μm,σz = 100 μm • Well adapted to our problem • Used byL3, adopted by (GEM) and ATLAS • Advantages: it is a 3 dimension sensor … and no laser beam is used (safety) gms, jyg, mont dore 2002

  6. A realistic RASNIK segment • Initial positions of the Mask and Camera not on the Lens axis • Initial recorded Mask image is not centered on the Mask • x M,L,C, yM,L,C, zM,L,C shifts can be extracted from the analysis of the final Mask image gms, jyg, mont dore 2002

  7. The recorded images y 16 pads x M 25 pads 25 pads gms, jyg, mont dore 2002

  8. Equations to be solved • x0 (y0): initial distance between the camera and the plane xOz (yOz) containing the optical axis of the lens • δ (δ’): initial Mask-Lens distance (Camera-Lens) along the optical axis • The displacements of the RASNIK elements (Mask, Lens, Camera) in their coordinate systems are:xM, yM, zM, xL, yL, zL, xC, yC, zC • Few RASNIK lines are necessary for the monotoring of three planes … if these planes are rigid planes • x, y: shifts of the image • M: magnification x y M (Philippe Pillot) gms, jyg, mont dore 2002

  9. Proposal for a new set-up Reference plane • We propose to study the performance of a monitoring system with: • 8 RASNIK segments on: the muon filter (C), the chamber 10 (L), the chamber 9 (M) • Then, 8 RASNIK segments on: the chamber 10 (C), the chamber 8 (L), the chamber 6 (M), the chamber 6 (C), the chamber 4 (L), the chamber 2 (M), the chamber 9 (C), the chamber 7 (L), the chamber 5 (M), and the chamber 5 (C), the chamber 3 (L), the chamber 1 (M) • And, to increase the constraints between the two groups of chambers, 8 RASNIK segments on: the chambers 2 (C), the chamber 1 (L and M), and the chamber 4 (C), the chamber 3 (L and M) gms, jyg, mont dore 2002

  10. Present work • Evaluation of the performances of the proposed setup • Resolution in position of each chamber • Resolution in mass at the Υ mass • Localization of the monitoring lines through the spectrometer • Position of the elements on the chamber frames/supports … in collaboration with the Engineers • Decision (?) for a monitoring of the chamber/support flatness • Choice of the system, position of the elements … in collaboration with the Engineers • Alternative to RASNIK (?) • System baseline design to be decided by June 2002(?) gms, jyg, mont dore 2002

  11. Project plan • Development of the system starting as soon as possible in 2002 • Measure of the performances • Study of the temperature gradient effects (neutralization) • Technical support demanded, answer expected soon • Realisation of the system starting in 2004 • Design study • Fabrication of sensors and supports • Calibrations • Installation • Lyon and Erevan • Budget (MOU) • 140 KFS to be re-estimated gms, jyg, mont dore 2002

More Related