An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Segment Produkcja Oddział Produkcji Rudnik

  2. Polimex–Mostostal S.A. Rosja GDYNIA GDAŃSK Litwa Niemcy SZCZECIN ŁÓDŹ SIEDLCE WARSZAWA Białoruś LUBLIN 275 km Polimex-Mostostal S.A. Oddział Produkcji Rudnik ul. Stalowa 5 37- 420 Rudnik nad Sanem tel. +48/15 642 29 01 fax.+48/15 876 10 43 e-mail:rudnik@polimex.pl www.mostostal.com OPOLE 120 km Czechy 240km 60km RUDNIK nad Sanem GLIWICE KRAKÓW Ukraina RZESZÓW Słowacja

  3. Historia 1964 – początki Zakładu Konstrukcji Stalowych w Rudniku w ramach Mostostalu Warszawa 1977 – przejęcie Zakładu Konstrukcji Stalowych w Rudniku przez Mostostal Stalowa Wola 2002 – połączenie Mostostalu Stalowa Wola S.A. z Mostostalem Siedlce S.A. 2004– połączenie Mostostalu Siedlce S.A. z Polimex-Cekop S.A. – powstaje Polimex- Mostostal Siedlce S.A. 2006 – zmiana nazwy spółki na: Polimex- Mostostal S.A.

  4. BUDYNKI, BUDOWLE, POWIERZCHNIE • Budynek administracyjny: 693 m2 • Hala główna ( 6-cio nawowa ): 7918 m2+część socjalno-biurowa: 2024,6m2 • Estakada zadaszona i częściowo zabudowana ścianami : 3930 m2 • Hala malarni : 2690 m2+część socjalno-biurowa: 1514,3m2 • Magazyn stali : 4500 m2 • Magazyn wyrobów gotowych : 5400 m2 • Magazyn techniczny : 297 m2 • Całkowita powierzchnia Zakładu : 7,0033 ha

  5. Park maszynowy Oddział Produkcji Rudnikposiada następujący park maszynowy:

  6. STRUKTURA ORGANIZACYJNA Struktura zatrudnienia Razem: 324osób Umysłowi: 74 osoby Fizyczni: 250, w tym 35 osób pośrednio produkcyjnych

  7. PROFIL PRODUKCJI I MOŻLIWOŚCI PRODUKCYJNE Zdolności produkcyjne zakładu wynoszą 600 -900Mg miesięcznie. Branża: • Energetyka, chemia, ochrona środowiska - kanały, obudowy wentylatorów, bunkry, zsypy, heatery

  8. Budownictwo przemysłowe

  9. Telekomunikacja

  10. Budownictwo drogowe

  11. UPRAWNIENIA I CERTYFIKATY Jakość naszych produktów odpowiada najwyższym standardom, co potwierdzają liczne świadectwa kwalifikacyjne i certyfikaty.

  12. NASI KLIENCI

  13. LISTA REFERENCYJNA WYKONYWANYCH PROJEKTÓW • Promecon AS - Shipyard “ Lindo” – Hall steel structure, Odense, Denmark, 1750 tons, 2004/2005 • NLI Alfr. Andersen – Melkøya Hammerfest – prefabrication of steel structure buildings LNG Plant for Statoil and Linde – 2004 • Płock Refinery- Olefiny II – Platform’s steel structure Płock, Poland 700 tons, 2004/2005 • Delivery and erection of structures and equipment for Pflriderer - Novogorod and Kronospan - Egorievsk, Russia, Kronospan - Sebes, Romenia - 3200 tons, 2005/2006 • AS Barlage –Port-Unloading steel structures, Iceland - 651 tons 2005/2006 • NLI Alfr. Andersen –Prefabrication of steel structure of Drammen Bridge elements: brackets, main frames, walkways, suspensions – Norway, 2004/2006 • Norkstaal as - Bridges, Stravanger, Norway, 392 tons,2006 • Novmar Sp. z o.o. – support structure for tanks, silos along with platforms, handrails, gratings and piping - Project Dunbar, Scotland, 265 tons - 2006/2007 • Pfleiderer– suport structure, Grajewo, Poland - 650 tons, 2006/2007 • Alstom - DeNOx System - Fabrication and erection of support structures, ducts and SCR Casings, Cordemais, France,2000 tons 2006/2007 • Howden UK - Heaters-10 sets of heaters (static parts) - Jeddah, Saudi Arabia, 404 tons, 2006 • Howden UK - Heaters-4 sets of heater (static parts and rotors) – Isdemir, Turkey, 203 tons, 2006 • Howden UK - Axial fan- La Robla, Spain, 32 tons, 2007 • BttBatignoles - Support structure for radiator – 21611 Project, Saudi Arabia, 363 tons, 2006/2007

  14. Steel structures for The Factory of Methyl Esters from Fatty Acids Wratislavia, Wroclaw, 525 tons 2006/2007, • New building steel structure for The Factory of Methyl Esters from Fatty Acids Wratislavia, Brzeg Dolny, 970 tons 2006/2007 • Promecon AS – Steel structure Statoil Refinery- Projects Mech I, II, III, V, Kalundborg, Denmark - 1000 tons 2006/2007 • Camfil Farr Inc- Filters to Iceland- 180 tons, 2006 • Btt Batignoles Support structure for radiator – 21614 Project, Saudi Arabia, 362 tons, 2007  • NLI - Elkem Solar Plant structure – Norway, 170 tons, 2007 • Wartsila Finland Oy - Building structure – Attock – Pakistan, 473 tons • Wartsila Finland Oy - Building structure– Sangachal Project – Azerbejdżan, 1050 tons • Incinerating Plant structure Ovik – Norway – 172 tons, 2007 • Incinerating Plant structure Pori – Sweden – 282 tons, 2007 • Howden UK - GG Heater Structure - Narcea Project – Spain – 170 tons, 2007/2008 • Lahti Precision Oy - Guardian Glass Plant in Razań – Russia, 516 tons, 2007 • Lahti Precision Oy - Dry Mix Plant – suport structure and silos, 376 tons, Hyvinkaa, Finlandia, 2007 • Roberts & Schaeffer - Conveyors structure – USA, 600 tons, 2007 • Aalborg Engineering A/S - Support structure for boiler, ducts and housings to Kozuhohovo i Tereshkovo– Russia, – 825 tons, • Aalborg Engineering A/S - Shell structure – ducts and housings, support structure – Qatar, 230 tons, 2007

  15. Mostostal Zabrze - Petrorig Tower 3 – Norway, 162 tons, 2007 • Promecon A/S - Trestle bridges - Statoil EVM RO - Mongstad, Norway– 1070 tons, 2007/2008 • Boiler House - Krasnystaw – 600 tons, 2007/2008 • Astom Power System – Steel structure for Standing Boiler House for Maritza East 1 Power Plant- Unit I, Bulgaria, 1 876 tons, 2008 • Astom Power System – Steel structure for Standing Boiler House for Maritza East 1 Power Plant - Unit II, Bulgaria, 5300 tons, 2008 • Ducts and supports for Polaniec Power Plant, Poland, 2100 tons, 2008 • Alstom Power Systems GmbH- Ducts to Neurath Power Plant, Germany,1244 tons, 2009 • PEG SA- Service platforms for planes, Malta, 770 tons, 2008 • Babcock & Wilcox Vølund A/S - Steel structure, galleries and ducts for incinerating plant for Tafjord project, Norway, 240 tons, 2008 • Sandvik Polska S.A.- Steel structure for Bełchatów Power Plant - crushing plant, galleries and building structures, • Poland, 5600 tons, 2009 • Babcock & Wilcox Vølund A/S - Air Ducts, Galleries, Structure & Steel and Construction for incinerating plant for Meath project, Ireland, 780 tons, 2009/2010 • Sandvik Polska S.A.- Secondary Steel Structure for Bełchatów Power Plant, Poland, 1600 tons, 2009/2010 • Burmeister & Wain Energy A/S - Asnaes Power Plant - Absorber, Clean Gas Duct, Raw Gas Duct, • Support Structure, Galleries Staircases Ladders, Denmark, 690 tons, 2008/2009 • Aalborg Engineering A/S- Boiler frame steel structures, Boiler support beams,Access ways-Cengiz Project, Turkey, • 420 tons, 2009 • Howden UK- 2 sets of Air Heater- Novocherkasskaya Project- Russia, 300 tons, 2009 • Alstom Power Systems GmbH -Secondary steel structure for Westfalen Power Plant, Germany, 7600 tons, 2010/2011 • Danpro Steel Construction - Silo Roof's Steel Structure for Avedore Power Plant, Denmark, 232 tons, 2010

  16. ThyssenKrupp Fördertechnik GmbH- Train Loadnig Station-tower, bunkers, conveyor, Holland, 700 tons, 2010/2011 • DIA Engineering & Manufacturing GmbH - Ducts for Mannheim-9 Power Plant, Germany, 340 tons, 2011 • Alstom Power Systems GmbH- Secondary Steel Structure for Ledvice Power Plant, Chech Republic, 17500 tons, 2010/2011 • Babcock & Wilcox Vølund A/S- Steel structures for incinerating plant for Forus 2 Project, Norway, 350 tons, 2011 • Babcock & Wilcox Vølund A/S- Steel structures for incinerating plant for Filborna Project, Sweden, 765 tons, 2011 • Babcock & Wilcox Vølund A/S- Steel structures for incinerating plant for Landskrona Project, Sweden, 425 tons, 2011 • Babcock & Wilcox Vølund A/S- Steel structures for incinerating plant for Voimala Project, Finland, 400 tons, 2011 • Babcock & Wilcox Vølund A/S- Steel structures for incinerating plant for Lidkoping Project, Sweden, • 350 tons, 2011 • Foster Wheeler EnergiaOy – project Kladnosilosy, 256 ton 2011 • DSSM - Cross arms, 4943 tony, 2011-2014 • DP Clean Tech Europe AS - PannonSuperheater, 36 ton 2011 • Howden UK - Cherepetskaya, Rosja, 518 ton 2011 • Generalna Dyrekcja Dróg Krajowych – Wiadukty WA-4, WA-9,WA-12, WD-2 , 4 274 tony 2011-2012 • Kardex - Bamberger Project, NKD Projekt, Gemu, 492 tony 2012 • Howden UK - wentylatory odśrodkowe-Projekt S-GOK, Open Inlet, Inlet Down, Ratcliff, Kanały Prelude, 264 tony 2012-2013 • Ramboll Fortum – Brista, 1 452 tony 2012-2013 • Hamon – projektLukOil, Total, JGC, Jacobs, Naftan, 888 ton 2012-2013 • Aalborg – project Erfurt, Outelet duct, 141 ton 2013

  17. KONTAKT Dyrektor Andrzej Pietruszczak tel: +(48)15 876 10 58 email: Andrzej.Pietruszczak@polimex.pl Zastępca dyrektora Włodzimierz Mońka tel: +(48)15 876 10 58 email: Wlodzimierz.Monka@polimex.pl Kierownik działu Robert Kosmal tel. +(48)22 829 72 26 email: robert.kosmal@polimex.pl Specjalista ds. finansowych Radosław Kuldo tel. +(48)22 829 72 88 email: radosław.kuldo@polimex.pl