1 / 8

Group Commitments

Group Commitments. & Resources for Physics. Reminder – Today’s situation. Tilecal ( Carles, Ilya, Matteo C., Matteo V., Ulla ) Calibration electronics commisioning General Tilecal commissioning Trigger EF Infrastructure ( Hegoi, Martine, Serge )

kennan
Download Presentation

Group Commitments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Group Commitments & Resources for Physics Martine Bosman - Group Commitments - IFAE Atlas Dec.21 2005

  2. Reminder – Today’s situation Tilecal (Carles, Ilya, Matteo C., Matteo V., Ulla) Calibration electronics commisioning General Tilecal commissioning Trigger EF Infrastructure (Hegoi, Martine, Serge) PESA (Carlos, Ester, Martine, Pilar) Physics – Combined Performance gamma+jet & Jet reconstruction/calibration/algorithms (Carolina, Martine, Sigrid) “Trigger aware” analysis (Carlos, Pilar) Martine Bosman - Group Commitments - IFAE Atlas Dec.21 2005

  3. Group Commitments - Tilecal Calibration electronics commisioning + development commissioning of all integrators – ADCi – ROBs Beginning 2006 FT at CERN – then on call “shaft-board” (control of 3 calibration systems) ½ 2006 design / prototype cycle Carles + Ilya production & commissioning Carles + Ilya++ Calibration data readout & treatment (via DCS) Ulla General Tilecal commissioning MobiDaq based: for commissiong and standalone cosmic (Ulla) Integrator expert (Ilya++=team) Cosmic Runs: 2006-2007 (some involvment) Tilecal Standalone Cosmic Run (2006), Combined wih Muon System (from Feb2006) & LAr (from May2006) Long-term M&O commitment to Tilecal: 0.5FT + 0.5Student Martine Bosman - Group Commitments - IFAE Atlas Dec.21 2005

  4. Group Commitments - Tilecal Availability: Ulla Tilecal ( 90%) until fall 2006, 10% after ready for strong physics involvment Ilya Tilecal ( 70%) until fall 2006, 30% after 50% Physics after fall 2006 MatteoV Tilecal( 50%),Tesina Tilecal(50%) until fall 2006 50% after starting PhD Physics >> around fall 2006 new “pool” of people available for physics Martine Bosman - Group Commitments - IFAE Atlas Dec.21 2005

  5. Group Commitments – Trigger – Event Filter Finalize design and implement all functionalities Trigger, calibration, monitoring 2006 (Serge 80%, Martine 10%, + ??) Testing functionality, performances, scalability & robustness in testbeds & Cosmics run 2006 (Hegoi 100%, Serge 20%, +??) Commissioning of the EF system in Atlas First ½ 2007 M&O of the Event Filter Second ½ 2007 onwards 0.5 FTE + 0,5 Student >> starting 2007 Serge available 50% for physics Martine Bosman - Group Commitments - IFAE Atlas Dec.21 2005

  6. Group Commitments – Trigger – PESA Finalize design and implemention of system July 06: algorithm review completed do slice tests with DC3/CSC data Dec 06: blind test of HLT selection (Carlos 50%, Ester 50%, Pilar) Integration with detectors Jan 07: progress trough 2006, completed by Jan07 testing with comics Trigger commissioning Mar 07: strategy for commissioning in place initial menus, including pre-scales >> emphasis changes from service to physics in 07 Martine Bosman - Group Commitments - IFAE Atlas Dec.21 2005

  7. Group Commitments – Combined Performance gamma+jet Jet reconstruction: calibration/algorithms/effect of Noise,UE,MinBias Underlying Event, Jet multiplicity, QCD measurement; 2006 Tesina Sigrid >> emphasis changes from “Comb.Perf.” to physics in 07 Martine Bosman - Group Commitments - IFAE Atlas Dec.21 2005

  8. Availability for Physics (optimistic!) • New group members: • Imma Riu (R&C); PostDoc 2006; CDF 07-08; student 07 • Maximum Senior/PostDoc time for physics = 0.7 • students evolve from 0.5 to 1 last year Martine Bosman - Group Commitments - IFAE Atlas Dec.21 2005

More Related