10 likes | 186 Views
ASAT Project Kickoff Meeting Follow-ups. EF/KJ Draft knowledge hierarchy and lexicon for discussion Plan next meeting at OSU in November BHJ: Prepare a talk on new auditory/cortical features CHL Set up a temporary website for meeting depository
E N D
ASAT Project Kickoff Meeting Follow-ups • EF/KJ • Draft knowledge hierarchy and lexicon for discussion • Plan next meeting at OSU in November • BHJ: Prepare a talk on new auditory/cortical features • CHL • Set up a temporary website for meeting depository • Share some codes and preliminary results (present in Nov.) • Draft a group work plan (for discussion in Nov.) • MAC: Share with the team about specific project ideas • SD: Share with the team about specific project ideas • LRR: Prepare a talk on synchrony/modulationspectrum • Everyone: Draft first year work plan and milestones