ECO Project UpdateKamarudin Bin TambiProject Lead Singapore EDI Committee - HOD
Agenda • Introduction to ECO • ECO Project • Work Done Till Date • Project Milestone
Certificate Of Origin What is “Certificate of Origin” ? • A document required by trading partners/ governments/ banks to verify the origin of goods • Mainly used to obtain preferential duty rates
ECO Process CO Application CO Application Signed CO Application Chamber Exporter’s Bank Importer’s Bank Exporter Clerk Exporter Clerk Agent Clerk Agent Signatory Exporter Signatory AO Inbox endorsement In progress Embassy Certified CO Importer Customs Overseas Secure CO Repository
ECO Project • Identified as the pilot project in the 21st AFACT meeting in Karachi • Project Proposal sent to all participants • Deliverables • ECO Business Collaboration Schema • ECO XML Schema • ECO Interconnection Specification • Meetings • Four virtual meetings held over 1 year • Participants from Chinese Taipei, Australia, Malaysia, Korea and Singapore attended the meeting
Business Collaboration • Business Collaboration • A set of business transactions between business partners • Transaction Choreography describes ordering and transitions between business transactions • Described using ebXML BPSS
ECO Business Collaboration ECO Process Sequence Diagram
ECO Interconnectivity Specs • ECO Interconnectivity Specification • Message format is based on COML ECO XML Schema • Business process is defined in ECO BPSS schema • ebXML Messaging Service 2.0 • W3C XML Signature and Encryption (digital cert conform to X.509 ver 3.0) • Defines a set of test cases: success and failure • ebXML engine certified by ebXML Asia Committee preferred
ECO Project Milestone • Phase 1 (Apr 04 – Sep 04 completed) • Work on the data model • Present progress report & draft data model to 22nd AFACT Plenary • Phase 2 (Oct 04 – May 05 completed) • XML implementation of data model • Work on collaboration model • Prepare Interoperability Specification • Phase 3 (July 05 – Dec 05) • Conduct ECO Interoperability Test (for member countries that have an ECO system)