An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case StudyProctor Guide Kick-Off 2004

  2. Customer Environment • Two Data Centers • 20 Branch Offices • Centralize Data Center Storage Management • All Host have a single path to their storage arrays • ESN Manager 2.1 • Cut over does not need to be migrated ( server is available for use) • Connectrix Manager 6.03 • HPOV NNM 7.0 check matrix for version (W2K)

  3. Storage Admins • 2 in Datacenter 1 • 1 in Datacenter 2 • 1 via Remote VPN • Device Groups are created on • Must have symm agent proxy to it ( symm agent not on server otherwise could be primary for all ) • DC1-DGserver • DC2-DGserver

  4. SAN Network • Datacenter 1 total 376 ports • McData / Brocade – • 2x ED140M CTX Mgr 6.0.3 -> 280 ports • 3x DS-32B2 4.0.2a -> 96 ports • 7 fabrics • No ISL • Datacenter 2 total 192 ports • Cisco MDS 9216 & 9602 1.0(4), 1.2 (1a) • 2x 96xx -> 192 ports • 7 fabrics • No ISL • Branch Offices 20 branches x 64 ports –> 1280 total • Brocade • 2x DS-32B2 4.0.2 a • 2 fabrics • Total ports 1280 + 192 + 376 -> 1848 • Recommend one FCC agent per site main datacenter will handle branches

  5. Hosts All HBA are SNIA compliant

  6. Storage Arrays • Symmetrix (18) • Ratio of agent to symm • SRDF impact • Microcode upgrade • HDS (6) • Horcm 01.05.03 • 9970 not supported • Celerra (2) • NS600 2/1 • CFS DM – 4/1 • Celerra: Any, when used with Symmetrix, CLARiiON CX600, NAS OS 4.0 and higher, NS600 requires 5.1.94 and higher • CLARiiON CLARiiON CX600 Navisphere CLI 6.1 a CLARiiON CX200, CX400 Navisphere CLI 6.2 a Different version require separate agents • FC4700 (1) in DC1 • 65 Volumes • CX600 (1) in DC2 • 120 Volumes • CX200 (20) in all Branch Offices • 80 Volumes each

  7. Symmetrix Detail

  8. Available Servers • Dual 1.0Ghz, 1Gb Mem, 80Gb Disk, HBA • Is ESN Manager • Quad 700 Mhz 4Gb Mem, 180Gb Disk, • Two in stock not being used • Dual 700 Mhz, 512mb Mem, 40gb Disk, HBA • Two in stock not being used • Buy additional servers 2.4 Ghz+ • Console systems desktop required 512 MB avail for console

  9. Considerations • Future Growth – • Host ( 50% additional host in next 12 months ) • Arrays ( consolidation 12-24 months out ) • Latency • > 15 ms check remote locations for agents and console • Default is 2 TS sessions for Server ( might require additional licenses ) • Collecting WLA which hosts • All symm , CLARiiON, Celerra , hosts • Symm MicroCode levels • reduced functionality with some MC • Cluster • No clustering