Essex County Highways 2012 Construction Program Peter Bziuk P . Eng. Manager Construction Services. Essex County Transportation Services Department. Essex County Highways. 2012 Construction Program Highlights $14,200,000 expenditure level Includes approx. $ 1,100,000 from 2011
E N D
Essex County Highways 2012 Construction Program Peter Bziuk P. Eng. Manager Construction Services Essex County Transportation Services Department
Essex County Highways • 2012 Construction Program Highlights • $14,200,000expenditure level • Includes approx. $1,100,000 from 2011 • Rehabilitation Program • Capacity Improvement Program
Rehabilitation Program • 25 Planned Projects • 5 Bridges ( 2 Engineering, 3 Construction ) • 11 Roads • 5 Maintenance • 4 Culverts ( 2 Engineering, 2 Construction )
Capacity Improvement Program • County is continuing a multi year capacity improvement program for the network • County funding is being utilized, Senior level funding is being pursued • 7 Planned Projects for 2012 • 5 Construction, 2 Engineering
Essex County Highways • Bridge Projects ($2,970,000) • 3 Structure Rehabilitations • CR 22 @ Duck Creek • CR 10 @ Long Marsh Drain • CR 14 @ Collard Drain • 1 Structure Rehab / Expansion: • CR 22 @ Puce River • 2 Pre-engineering for 2013 construction: • CR 14 @ Silver Creek • CR 42 @ Moisson Creek
Essex County Highways • Culvert / Drainage ( $1,182,000 ) • CR 14 @ Maddox Drain culvert replacement • CR 19 @ East Townline Drain improvements • CR 34 – Drain Improvement – Kingsville • 2 – Culvert Engineering projects for 2012 • CR 43 @ Gzowski Drain • CR 50 @ Beaudoin Drain
Essex County Highways • Road Projects ($4,940,000) • Recycling/Resurfacing: • CR 19 Tecumseh/Lakeshore – 2.8 km • CR 12 Essex – 3.0 km • CR 20 LaSalle – 3.0 km • CR 19 Lakeshore – 0.5 km • CR 18 Kingsville – 1.1 km • CR 34 Leamington – 5.9 km • CR 8 Lakeshore/Essex – 2.2 km • CR 8 Essex – 1.2 km • CR 3 LaSalle – 1.7 km • CR 10 Amherstburg – 4.1 km
Essex County Highways • Pavement Preservation ( $250,000 ) • Route and Seal – various locations • Surface Treatment – various locations - 12 km • Bridge Preservation • 4 deck/expansion joint repairs • Various guiderail repairs / upgrades • Estimated Quantities • 39,740 tonnes of Hot Mix Asphalt • 99,200 sm. of Pavement Recycling • 17,550 tonnes of Granular A
Essex County Highways • Capacity Projects ( $3,200,000 ) • CR 23/46 – Intersection Improvements – LS • CR 22 Phase 5 - Contract A – LS • CR 19/22 Improvements - Engineering • Various Connecting Link projects with Towns • CR 19 - Tecumseh • CR 6 – LaSalle • CR 20 - Amherstburg
Essex County Highways • EA’s / Engineering: • CR 19 / CR 22 with MTO Prelim. Design ($200M) • CR 22 – CR 2 to Puce Detailed Design ($18.5M) • CR 42 EA – CoW to CR 25 ($30M) • Lauzon Parkway Extension – MTO/CoW /CoE • Active Transportation Study ($52M) • Adoption and implementation
Essex County Highways • Thank you for your interest, • Thank you for your support in delivering our annual programs, • Looking forward to another successful construction season.