Access Line Operation Analysis & • Case Study in Beijing Metro System Zhili Liu, Ph.D. School of Traffic and Transportation Beijing Jiaotong University Email: liuzl@bjtu.edu.cn
THE DEVELOPMENT OF BEIJING METRO NETWORK OVERVIEW An Overview of Beijing Metro: GATEWAY CITIES PORT OF LONG BEACH PORT OF LOS ANGELES CALIFORNIA
PEAK HOUR TRAFFIC IN BEIJING METRO SYSTEM • CHALLENGE OutsidetheStation On the Platform OnthePlatform Source: http://i2.feixin.10086.cn/feed/du32hypci7hv6?regid=405722
PEAK HOUR TRAFFIC IN METRO • CHALLENGE
THE DEVELOPMENT OF BATONG LINE OVERVIEW • Opened in 2003, entirely above ground ,runs 18.9 km from Sihui (B) in the west to Tuqiao (A) in the east. • Extends Line 1 further east from Chaoyang District to suburbs in Tongzhou District across E 4th,E5th to E 6TH . E. 6th Ring Road E. 5th Ring Road E. 4th Ring Road
ENHANCING THE CAPACITY IN • BATONG LINEMEET THE CHALLENGE • Upgrade signal system to reduce headways (76.4%) • Enlarge fleet size 4 cars to 6 cars (164%) • Control traffic on platforms • Control traffic outside stations • Open a BRT on Jingtong Expressway
ENHANCING THE CAPACITY IN • BATONG LINEMEET THE CHALLENGE
JINGTONG BRTOVERVIEW BRT Phase II BRT Phase I 7:00-9:00 AM Westbound 5:00-7:00 PM Eastbound Outside BRT (WB) Jianguomen Dawangqiao Sihui Shuanghuiqiao Inside BRT (WB) CL Inside BRT (EB) Outside BRT (EB)
BATONG Line OPERATION Passenger volume on the Batong line reduces more than 6,000 passengers /day during the AM peak hour of the first 3 days. Before After Passenger volume was reduced in the stations close to the departure stops of BRT.
JINGTONG BRTOPERATION Bus Metro Bus+Metro Car Taxi Others
CONCLUSIONS The study has showed that the Batong line has experienced heavy congestion in the AM and PM peak hours. A number of solutions has been implemented to reduce the congestion on the Batong line. The BRT lines has attracted the traffic from the Metro system. Further research is needed to study the impacts of BRT services on the Metro system.