An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joint Base San Antonio Civil Engineering Opportunities, Challenges Organization 502 (802/902) CES John Enyeart, Chief Portfolio Optimization
  2. AGENDA Project Opportunities at JBSA Project Challenges JBSA Expectations JBSA Reorganization
  3. Opportunities Infrastructure Needs Across JBSA Pavements Roof Repair HVAC – Energy upgrades Fire Safety Upgrade Mission Partner Renovations IDIQs/SABER EOY for FY 13: renovations, repairs, relocations BCAMP submittal for FY 14 FSD and Well repairs at FSH/CB, structural repairs at RND Airfield lights for LAK FY 15: Airfield obstructions and pavements, base roofs
  4. BCAMP Overview Six Integrated Priority Lists (IPLs) Restoration & Modernization (R&M) -- $250M Sustainment -- $100M Demolition Environmental Quality Housing P-341 Three Focus Funds Dorms (DFF) Energy (NRG) Demo BCAMP Data Call Timeframes FY14 priorities set at HAF FY15 BCAMP submission Nov / Dec 13 Seven(+) Scoring Models!
  5. Challenges Infrastructure repairs - limited funds Projects at 1/3rd typical budget Total O&M outlay this time: 16% of past year FY 12: $390M -- FY 13: $64M Project priorities: Worst areas only—enough to get another 8-10 yrs on facility system Innovations for pavements and storm drainage, focused roof repairs, HVAC upgrades by component Mission Partner Funded Projects Renovations: Medical ($4.5M), C2, New units
  6. Joint Base San AntonioFacility Board Members Chair: 502 ABW/CC VOTING MEMBERS: Air Education and Training CommandUS Army North US Army Installation Management Command US Army Medical Command US Army SouthAir Force Personnel Center 24th Air Force 59th Medical Wing Southern Regional Medical CommandArmy Medical Dept Center and School Medical Education and Training Campus Brooke Army Medical Center Mission and Installation Contracting Command 37th Training Wing 12th Flying Training Wing Air Force ISR Agency Cryptologic Systems Division Building 171 IFC 433rd Airlift Wing (AFRC) 149th Fighter Wing (TxANG) 502d CES/CL (Energy, Utility, Infrastructure) Navy Medicine Education Training Cmd 502d Logistics and Security Support Group 63rd Regional Support Cmd (USAR) 502d Force Support Group 502d Installation Support Group
  7. Expectations Competition vs sole source/8A Avoid sole source—compete even small business Design-Build as norm for all repair/ renovation/ upgrades Balance risk of unforeseen conditions with Gov’t JBSA A-E IDIQ FY13 => furlough; target for FY 14 pending CONS capacity
  8. JBSA reorganization ABW MSG => Installation Support Group JBSA Civil Engineering JBSA merger CE Transformation IAW PAD (Oct 2012)
  9. CEN Joint Base San Antonio Commander (502 ABW) Direct Reports Wing Staff Logistics & Security Spt Group Installation Support Group Force Support Group XP SE, PA, etc Msn Spt Force Spt CE Comm Ops Spt- LAK SFS LG (Trans, Sup, etc) Trainer Fab FM CONS Band
  10. CEN Joint Base San Antonio BCE (502 CES) CEF Fire CEN Eng CEO Ops CEI Inst Mngt CEA Asset Acct CEX EmerMngt CED EOD Over 1500 strong!
  11. CEN CEN Engineering 0/0/3 CENM RND ProjMgmt 0/0/17 CEND Portfolio Optimize 0/0/34 CENM LAK ProjMgmt 0/0/24 CENM Central Design 0/0/26 CENM FSH Proj Mgmt 0/0/21 Planning Programming Energy Design Team Tech Support - Geobase - CAD spt Post Award Design and Construction
  12. JBSA Civil Engineers BuILD STRONG! Questions???