160 likes | 824 Views
Submitted by Krishnachaitanya Inturi. People Capability Maturity Model-PCMM. Why do we need PCMM?. QUOTE.
E N D
Submitted by KrishnachaitanyaInturi People Capability Maturity Model-PCMM
QUOTE • “When human capital owners [employees] have the upper hand in the market, they do not behave at all like assets. They behave like owners of a valuable commodity…They areinvestorsin a business, paying in human capital and expecting a return on their investment.” [Davenport 99]
Maturity levels : The five maturitylevels of the People CMM are: • Initial-Maturity level 1 • Repeatable-Maturity level 2 • Defined-Maturity level 3 • Managed-Maturity level 4 • Optimizing-Maturity level 5
Future ScopeCase studiesCalibrating Qualitative and Quantative PCMM in particular case are needed at various levels
References: • Overview of the people Capability Maturity Model.-B Curtis,WEHefley,S Miller-stinet.dtic.mil • Basili,V.R.&Hutchens,D.H.”An Empirical study of a Syntactic Complexity Family.”IEEE Transactions on Software Engineering9. 6(1983):P 664-672. • Brooks.F.P.Jr.”No Silver Bullet:Esence and Accidents of software Engineering.”IEEE Computer 20.4(April 1987):P 10-19. • Boehm.B.Software Engineering Economics.EngelwoodCliffs,NJ:Pretence –Hall,1981. • www.sei.cmu.edu-last accessed on 20thoctober.