An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Corps of Engineers Levee Safety Program Jim Martell, P.G. Geologist / Engineer Levee Safety Program Manager Tulsa District Corps of Engineers Flood Gate In Halstead Kansas

  2. Levee Safety …is the art and science of ensuring the integrity and viability of levees such that they do not present unacceptable risks to the public, property, and the environment West Columbus, Ohio

  3. National Levee Safety Program • Background: • USACE Flood Damage Reduction mission began with the 1917 Flood Control Act • Significant Role in flood activities nationwide to include the protection of life and property behind federal levee systems. • Hurricane Katrina and Rita devastation in 2005 brought levee safety to the forefront of public awareness • Findings of investigations into flood damage reduction system’s performance in New Orleans prompted the need for a comprehensive and risk-informed approach to national levee safety, including periodic assessments.

  4. Graduated Levee Assessments Robust Levee Safety Program Routine Inspections: Verifies O&M, More Rigorous Standards, Improved Communication, System-based, Every Year Continuous Feedback Periodic Inspections: Verifies O&M, Evaluates Structure Stability, Compares Constructed Criteria to Current Criteria, Every 5 Years Increasing Rigor, Effort Periodic Assessments Periodic Inspection + Potential Failure Mode and Consequences Analysis, Every 5 Years Risk Assessments Data Intensive, Determine Likelihood and Consequences of Failure, TBD - Every 10 Years

  5. Levee Inspection Program Corps Regulations/Guidance • 33 CFR 208.10 • ER 500-1-1 (RIP Program) • DR 1130-2-530, Project Operations MAINTENANCE STANDARDS, PROCEDURES AND GUIDELINES ON MODIFICATIONS TO PROJECTS • Levee Owner’s Manual • Levee District semi-annual inspection report • Laptop Inspection Tool

  6. GPS keeps track of location Pop up menus allow Inspector to enter inspection notes

  7. Levee Safety – Tulsa District • Total 231 Miles of Levees and 59 miles of Improved Channels • Inspection of Completed Works (ICW) Program • 17 Federally constructed/locally operated and maintained levee projects (207 mi.) • 11 Federally constructed channel projects totaling 59 mi. • Rehabilitation Inspection Program (RIP) • 3 Non-Federal (privately constructed/operated and maintained) levee projects (7 mi.) • Corps Owned Operated Levees • 8 USACE owned/operated levee projects (17 mi.) – Corps Operated and Maintained

  8. National Levee Safety Program - Current Activities • Engineering Technical Letter (ETL) No. 1110-2-571 Guidelines for Landscape Planting and Vegetation Management at Levees, Floodwalls, Embankment Dams, and Appurtenant Structures. • This ETL does not establish new standards, but clarifies, and supersedes, those formerly presented in EM 1110-2-301 (Jan. 1, 2000). • Key Points • Fifteen feet is the minimally accepted vegetation free zone (VFZ) and is widely viewed as not sufficient for all projects. To date, no research exists to justify a reduction to existing standards. • If an existing project easement (real estate interest) allows for less than 15 feet, the VFZ shall be the maximum attainable within the existing real estate interest. • The ETL discusses a limited range of conditions under which a variance to vegetation standards may be granted. The variance request process is currently under revision and interim guidance is available through the HQUSACE Levee Safety Program Manager (LSPM). Public safety will not be compromised. • The standards in the ETL are not new, and USACE has considered them critical to flood damage reduction project reliability for decades. • The ETL is available at: http://140.194.76.129/publications/eng-tech-ltrs/etl1110-2-571/toc.htm

  9. National Levee Safety Program - Current Activities

  10. National Levee Safety Program Current Activities • AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 – Periodic Inspections of Levees : • $90 Million nationwide • Opportunity to leverage stimulating the economy through the use of the private sector contractors to accomplish Periodic Inspections with obtaining much needed information about the levee infrastructure throughout the nation. • The activity will assist in aggressively advancing the Levee Safety Program toward achieving its goal of reducing flood risks and improving public safety. • Complete execution of activities by September 30, 2010. • All levees in federal levee program including inactive levees

  11. National Levee Safety Program Current ActivitiesThe Levee Screening Tool • The Levee Screening Risk Assessment (LSRA) Tool (Microsoft Excel Spreadsheet) provides a preliminary assessment of the general condition and associated risks of levee segments and systems in support of the USACE Levee Safety Program. • Routine inspection data will be combined with a preliminary engineering assessment to indicate the ability of a levee system to perform as intended and the consequences of potential failure. • The LSRA determines a preliminary relative risk index that will consider routine inspection results and ratings coupled with a review and evaluation of historical performance data, as-built drawings, economic and life loss consequences, historic and current hydraulic and hydrology data, and other data. This will help determine the potential for failure and the consequences of failure.

  12. National Levee Safety Program Current ActivitiesNational Levee Database – Surveys for Tulsa District • Congress directed the U.S. Army Corps of Engineers (USACE) to develop a national levee inventory to locate and document the status of levees under Federal jurisdiction. A cornerstone of this effort is the National Levee Database (NLD). • Contractor, PBS&J, will survey levees this summer, fall and winter in federal program to collect detailed survey information on the levee without any cost to the city/county. This survey information is being collected for the NLD and will be shared with you after it is finalized and quality assurance checks have been completed.

  13. floodwall_line levee_flood_fight_point closure_structure_line levee_failure_point levee_crossing_point pump_station_point levee_centerline sand_boil_point piezometer_point rehabilitation line cross_section_line borehole_point protected_area levee_station_point levee_relief_well_piont gravity_drain_line encroachment point National Levee Database Model Geographic Features