Portela limitations and the need for a single new Airport for Lisbon

Portela limitations and the need for a single new Airport for Lisbon. ADP Studies and Today presentation. ADP undertook in 1998-19999 a synthesis of the previous studies of new airport sites (Ota and Rio Frio), complemented by : - Update of traffic forecast

kory
Download Presentation

Portela limitations and the need for a single new Airport for Lisbon

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Portela limitations and the need for a single new Airport for Lisbon 1 - Jean-Marie Chevallier - Aéroports de Paris / ADPi. 22/11/2005

  2. ADP Studies and Today presentation ADP undertook in 1998-19999 a synthesis of the previous studies of new airport sites (Ota and Rio Frio), complemented by : • - Update of traffic forecast • - New air operations organisation studies • - Evaluation of capacity of Portela airport, including a Super Portela concept • Preparation of a typical new airport layout Today presentation, based on materials from this consultancy comprises : • Portela and Super Portela capacity • Update of traffic forecast • New airport strategy • Rio Frio and Ota sites • Evaluation and recommendation • Future of Portela after opening of Ota new airport

  3. Portela Airport Potential • Runways • Runway 17/35 (2 400m x 45m) offers very little capacity, but brings operational • flexibility and emergency solutions (VMC only) • Capacity of runway 03/21 (3 800m x 45m) could be increased up to 35-38 mvts / h • within airport boundaries • Terminal • Check-in capacity ~ 3 200 p/h • Baggage claim capacity ~ 2 800 p/h • Boarding capacity could be increased with • new north pier (8 more gates = 15 contact gates) • Apron • 15 contact gates + 12 hard stands • Capacity : up to 25 hard stands between runways • Ultimate capacity • 38 mvts / hour • 15 + 25 = 40 apron stands (+ 5 reserve + cargo) • 2 800 pax / hour • 13 Mp / year • 150 000 T cargo

  4. The Super Portela Option • Capacity bottlenecks of Portela : • Apron capacity, constrained by runway 17/35 • Runway capacity • Terminal capacity (gates, curbside, bags) • Super Portela concept : • 80 ha land acquisition, with expropriation of • 10 000 people (!) • Closure of runway 17/35 • New close parallel runway 03/21, 365 m sepa- • tion (code E) • New taxiway to runway 21, 122 m separation • New terminal T2, south of existing hard stands • Estimated cost in the range of 800 M€ • Super Portela capacity : • 55/60 mvts/h • 70 traffic apron stands • 20 Mp • 240 000 T cargo T2

  5. Updated Traffic Forecast (1998) 2020 traffic forecast 4.4% average growth • 2000 : 8.8 Mp • 2005 : 11.2 Mp (10.6 in 2004) • 2010 : 13.8 Mp • 2015 : 16.8 Mp • 2020 : 20 Mp Long term potential • 28 MP in 1998 • 35 Mp today, on account of the outbreak of LCC. Portela capacity (13 to 20 Mp) is not sufficient for the long term.

  6. The new Airport Strategy A new airport site is a must for Lisbon, as even Super Portela would not be sufficient beyond 2020. When to move to the new airport ? - Building a new airport may be a lengthy process, about 8 to 10 years - Traffic forecasts show that Portela may reach capacity soon : 13 Mp in 2009, 17 Mp in 2015 ! • The more the transfer is delayed, the more capital expenses to be exposed for temporary extension of Portela • Due to capacity shortfall, level of service at Portela may seriously fall in the last years before transfer • Transfer should then occur as soon as possible

  7. New Airport typical layout • Long term capacity requirements • 30-35 M passengers • 300 000 mvts / year • 75 mvts / hour • 100 traffic apron stands • 400 000 T cargo • 2 parallel independent runways, with ~ 1700 m separation • All facilities in between the runways • Code F capability • Airport city at the airport entrance • Minimum site overall size : • 5 500 m x 2 500 m, or 1 400 ha

  8. Location of candidate sites • Rio Frio • 42 km east of Lisbon and 15 km of Setubal, on the left bank of rio Tejo, near Pinhal Novo • Runway orientation 17/35, non compatible • with Alcochete shooting range • Alternate orientation 08/26, compatible • with Alcochete andMontijo Air base • Ota • 45 km north of Lisbon, near Alenquer. • Former air base with 17/35 runway • New 01/19 runway orientation necessary to ensure convenient obstacles clearance

  9. Rio Frio 08/26 Site Site location Access

  10. Rio Frio 08/26 Site – Airspace Study East wind West wind

  11. Ota Airport Site Access Site location

  12. Ota Airspace Study North wind South wind

  13. Synthesis of site evaluation

  14. Consultant Recommendation The multi-criteria analysis clearly showed the following. • Rio Frio (08/26 runway orientation) is the best site for aeronautical purposes, road access and construction costs • Rio Frio (17/35 runway orientation) is the best site for noise impact • Ota is the best site for rail access, natural environment impact and operational costs On account of the Government decision to disqualify Rio Frio sites for risk of “serious, irreversible and non mitigatible natural environment impact”, Ota is an acceptable site for the new Lisbon airport.

  15. Evaluationof Portela Options - Munich (1992), Oslo (1998) and Athens (2001) all decided, with comparable level of traffic, to transfer in full and one shot to the new airport, the old one being closed to air traffic. • Should Portela retain some commercial traffic, this would bias competition between airlines staying at Portela and others moving to the new airport (see Milan issue with Linate and Malpensa). • The only acceptable split would be between short and long haul flights. - Such split would be a disaster for TAP Air Portugal, then unable to built a competitive hub between continental and intercontinental services - Compatibility of significant air traffic at both Ota and Portela does not seem practicable from ATC viewpoint - Cost of running 2 airports instead of one would be significantly higher - Continuation of air operations in Portela would also mean continuation of noise impact over approximately 200 000 people which could be spared with the full transfer. - Redevelopment of Portela and surroundings will be easier with full closure to air traffic

  16. Conclusion Like in Munich, Oslo and Athens, we recommend the full closure of Portela to air traffic at opening of Ota new airport. Assuming an implementation time between 8 to 10 years for Ota new airport, the traffic expected at the opening will be over 15 Mp and like in the above examples, the first stage of construction will have to include 2 runways and a passenger terminal ~20 Mp. Thank you for your attention.